My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> If the City's Representative is not an employee of the City, the City's Representative will <br /> write to the City upon reaching agreement with the Contractor, certifying that the Work <br /> ' is substantially complete, listing the items of incomplete Work, stating the date for <br /> completion of incomplete work, defining the division of responsibilities, and setting forth <br /> any other terms related to acceptance. In such event, the City will review the City's <br /> ' Representative's certification that the Work is substantially complete. If the City concurs, <br /> the City will notify the Contractor in writing that the Work is accepted as substantially <br /> complete. Except for any portion(s) of Work specified for early completion or required <br /> ' by the City for early possession, Substantial Completion will not occur for Work until the <br /> entire Project is ready for possession and use. The acceptance Notice will include a <br /> Punch List of incomplete Work items and corrective Works, set the date for their <br /> completion and repair, describes the division of responsibility between the City and <br /> Contractor, and describe other terms of acceptance. The Contractor will acknowledge <br /> receipt of the acceptance Notice in writing, indicating acceptance of all of its terms and <br /> provisions. <br /> Subsequent to the Substantial Completion date, the City may exclude the Contractor <br /> from the Work during such periods when construction activities might interfere with the <br /> intended operation of the Project. The City, however, shall allow the Contractor <br /> reasonable access for completion or correction of incomplete Punch List items. <br /> 1-08.5(3) Acceptance of Work <br /> (******) <br /> Upon completion of the Project, including, but not limited to, record drawings, as-builts, <br /> required reports and operations and maintenance manuals, the Contractor shall so notify <br /> the City's Representative in writing. Upon receipt of the notification, the City's <br /> ' Representative will promptly, by personal inspection, determine the actual status of the <br /> Work in accordance with the terms of the Contract. If the City's Representative finds <br /> materials, Equipment, or workmanship that do not meet the terms of the Contract, it will <br /> prepare a Punch List of such items and submit it to the Contractor. Following completion <br /> of the corrective work by the Contractor, the City's Representative will notify the City that <br /> the Work has been completed in accordance with the Contract. The City shall make the <br /> ' final determination of acceptability and completion. For portions of the Project not <br /> previously accepted as substantially complete, the conditions of guarantee shall <br /> commence on the date that the City determines the Project is complete. <br /> 1-08.6 Suspension of Work <br /> Supplement 1-08.6 by adding the following: <br /> 1-08.6(1) Suspension Procedures <br /> (******) <br /> The City may, at its convenience and at any time and without cause, suspend all or any <br /> part of the Work by notice in writing to the Contractor. The Contractor will be allowed an <br /> increase in the Contract Sum or an extension of Contract Time, or both, directly <br /> attributable to any suspension in accordance with the Change Order procedures in these <br /> Special Provisions; provided, (1) the Contractor shall not be entitled to any increase to <br /> ' the extent caused by the Contractor and (2) Contract Sum increases and Contract Time <br /> extensions for suspension caused by Third Parties or Force Majeure Events are limited <br /> as set forth in 1-09.11A(3)D THIRD PARTY CAUSED DELAYS AND FORCE MAJEURE. <br /> ' The Contractor shall resume the Work within five (5) calendar days after receiving written <br /> notice from the City to do so. <br /> 1-08.7 Maintenance During Suspension <br /> Delete all of 1-08.7 and substitute the following: <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April, 2022 <br /> WO No.—UP3766 SP—101 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.