My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> or covenants of the Contract. Termination shall be effective upon Contractor's and <br /> Surety's receipt of such notice <br /> For purposes of this section, the Contractor shall be deemed to be in default upon ' <br /> the occurrence of one or more of the following events: <br /> 1. If Contractor is bankrupt or insolvent. <br /> 2. If Contractor makes a general assignment for the benefit of creditors. ' <br /> 3. If a trustee or receiver is appointed for Contractor, or for any of <br /> Contractor's property. <br /> 4. If Contractor files a petition to take advantage of any debtor's law, or to <br /> reorganize under any bankruptcy chapter or law. <br /> 5. If Contractor repeatedly fails to make prompt payments to subcontractors <br /> or others for labor, materials, or Equipment. <br /> 6. If Contractor disregards laws, ordinances, rules, regulations, or orders of <br /> public bodies having jurisdiction. <br /> 7. If Contractor disregards the authority of the City or City's Representative. <br /> 8. If Contractor substantially violates the provisions of the Contract <br /> Documents or fails, neglects, or refuses to proceed in compliance with <br /> the provisions of the Contract Documents. <br /> 9. If the Contractor made material misrepresentations to the City with <br /> respect to: (a) its qualifications or those of its subcontractors; (b) its or its <br /> subcontractors' ability to perform the Work in a timely, workmanlike <br /> manner; (c) the materials installed or to be installed; or (d) progress pay <br /> estimates. <br /> 10. If Contractor fails to supply sufficient skilled workers or suitable materials <br /> or equipment. <br /> 11. If Contractor refuses or fails to prosecute the Work with such diligence as <br /> will ensure its Physical Completion within the original Physical <br /> Completion time and any extensions of time which may have been <br /> granted to the Contractor by change order or otherwise. <br /> 12. If Contractor disregards laws, ordinances, rules, codes, regulations, <br /> orders or similar requirements of any public entity having jurisdiction. <br /> 13. If Contractor performs Work which deviates from the Contract, and <br /> neglects or refuses to correct rejected Work. <br /> 14. If Contractor otherwise violates in any material way any provisions or <br /> requirements of the Contract. I <br /> After termination of the Contractor for default, the City may transfer performance of <br /> the Work to the Contractor's Surety or elect to prosecute to completion by contract <br /> or otherwise. I <br /> If the City chooses to provide such sufficiency of labor or materials as required to <br /> complete the Work, the City may exclude the Contractor from the site and take <br /> possession of the Work and all of the Contractor's tools, appliances, owned or <br /> rented construction equipment, and machinery at the site and use the same to the <br /> full extent they could be used by the Contractor. The City may incorporate in the <br /> Work all materials and Equipment stored at the site or for which the City has paid <br /> the Contractor, but which are not yet on site. In such case, the Contractor will not <br /> be entitled to receive any further payment until the Work is finished. At the City's <br /> sole option, Contractor shall assign and transfer any contractual rights to material <br /> and Equipment to be installed, incorporated, or used in the performance of the <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April, 2022 <br /> WO No.—UP3766 SP—104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.