Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> d. Horizontal and vertical locations of underground utilities and appurtenances, I <br /> shall be referenced to monumentation. The monumentation shall be based <br /> on NAD 83-91 for Horizontal Datum and NAVD 88 for Vertical Datum. I <br /> e. Any changes in centerline profile and curb & gutter (top of curb), offsets and <br /> elevations. <br /> f. Details, Equipment or materials used that were not shown on the original I <br /> Plans. <br /> g. The actual arrangement and routing of conduit, embedded conduit, raceways <br /> and piping relative to its location and proportioned to other work. The location I <br /> needs to be dimensioned on the record drawings. <br /> h. Contractor prepared piping schematics and diagram drawings representing <br /> the Equipment orientation. I <br /> i. Final location of all surface and subsurface improvements. <br /> j. Record on the drawings the location of all field run materials. <br /> k. All shoring systems left in place at the end of construction. I <br /> Contractor shall accurately show existing underground items including, but not limited <br /> to, piping, manholes, pull boxes, conduit, direct buried wire, foundations, equipment and I <br /> obstructions found during construction on the record drawings. Note on the record <br /> drawings the actual size of all utilities and structures and types of material used. Locate <br /> all record drawing items by survey coordinates or dimensioned off NAD 83-91 for <br /> Horizontal Datum and NAVD 88 for Vertical Datum. Minimum requirements for accuracy I <br /> are specified in the following chart. <br /> Description Horizontal Elevation Notes I <br /> Location <br /> Gravity sewer and Coordinates, I.E. 0.01 ft. Recalculate actual slopes. <br /> drain lines stations, and All inverts in manholes. I <br /> offsets 0.1 ft. All angle changes. <br /> Forcemains, Coordinates I.E. 0.1 ft. Record all angle points and <br /> watermains and and stations 0.1 finished ground elev. Above I <br /> transmission lines ft. the invert elev. <br /> All other items, incl. 0.1 ft. 0.1 ft. Show dimensions on record <br /> Electrical and drawings. , <br /> Structural <br /> Use red pen or pencil to make changes on the record drawings. Notations are to be <br /> neat, legible, clear and concise. I <br /> Record information concurrently with the progress of construction. Conceal no work <br /> until the required information is verified and recorded. <br /> 1-08.11(3) Payment I <br /> No separate payment shall be made for the preparation of record drawings. All costs <br /> associated with the preparation of record drawings shall be included in the unit contract <br /> prices of other items in the Contract. I <br /> 1-09 MEASUREMENT AND PAYMENT <br /> 1-09.1 Measurement of Quantities I <br /> Supplement 1-09.1 by adding the following: <br /> Measurement by the Ton: Where items are specified to be paid for by the ton it will be <br /> the Contractor's responsibility to see that a certified weight ticket is given to the City's I <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April, 2022 <br /> WO No.—UP3766 SP—108 <br />