My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Contractor shall not be entitled to any anticipated profits on deleted, terminated, or <br /> uncompleted Work. <br /> 1-09.6 Force Account <br /> Supplement 1-09.6 by adding the following: <br /> The City has estimated and included in the Proposal dollar amounts for all items to be <br /> paid per Force Account. This is done only to provide a common Bid for Bidders. All <br /> such dollar amounts are to become a part of Contractor's total bid. However, the City <br /> does not warrant expressly or by implication that the actual amount of Work will <br /> correspond with those estimates. Payment will be made on the basis of the amount of <br /> Work actually authorized by Engineer. <br /> 1-09.7 Mobilization <br /> Supplement 1-09.7 by adding the following: <br /> 1. Construction Identification Signs: Upon commencement of Work, the Contractor <br /> shall furnish and erect two Project/Construction Identification Signs in accordance <br /> with COE Standard Drawing No. 714, one at each end of each work area at <br /> Engineer approved locations. <br /> a. Contractor shall provide sign painting, lettering and detailing by a professional <br /> sign maker with Engineer approval prior to placement on job site. <br /> b. Contractor shall provide a Project Information Sign for each of the two <br /> Project/Construction Identification Signs. Attach Project Information Sign to <br /> the surface of the sign face in accordance with COE Standard Plan No. 714. <br /> The Construction Identification Sign shall contain the following three lines of <br /> information that the Engineer will provide: <br /> PROJECT NAME: <br /> PROJECT FUNDING: <br /> PROJECT COST: <br /> c. Contractor shall maintain signs and sign frames in a clearly legible condition <br /> throughout the progress of the Work and shall completely remove signs upon <br /> project completion. Deliver signs to the City's storage area for future City <br /> use. <br /> d. No separate payment for Project/Construction Identification Signs will be <br /> made. All costs associated with this item shall be merged with the unit <br /> contract price for"Mobilization." <br /> 2. Engineer's Field Office: The Contractor shall provide an office for the use of the <br /> Engineer that may be in conjunction or attached to the Contractor's field office. <br /> Sanitary facilities shall be nearby. The location of the office shall be adjacent to the <br /> project and at a location acceptable to the Contractor and the Engineer. The office <br /> shall be equipped with a desk, layout table, chairs and telephone and suitable <br /> lighting, air conditioning and heating. A telephone shall be installed for the sole use <br /> of the Engineer. It shall be a separate unit with a different telephone number than <br /> the Contractor's phone. Mutually agreeable measures for the security of the office <br /> shall be arranged between the Contractor and Engineer. The Engineer's office <br /> shall be on-site, connected to all utilities and fully prepared for occupancy prior to <br /> release of the first warrant to the Contractor. <br /> a. All costs for the Engineer's office, including telephone service for local calls <br /> only, shall be borne by the Contractor and shall be included in the <br /> mobilization cost. <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April,2022 <br /> WO No.—UP3766 SP—112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.