My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> the Project. Deliver salvage castings and materials to the location designated by the <br /> Engineer. <br /> 2-02.3(8) Waste Disposal <br /> Provide waste site for disposal of materials not required for construction. Arrange <br /> waste disposal at no expense to the City. Waste disposal shall meet the requirements <br /> of 2-03.3(7)C of the Standard Specifications. <br /> 2-02.3(9) Abandon Existing Water Valves In-place <br /> (******) <br /> Prior to abandoning existing water valves in-place, coordinate with City to have City <br /> forces close valve. After City forces verify valve is closed, remove valve box and <br /> extension, if any, and backfill with Gravel Borrow as specified in 9-03.14(1). Compact <br /> backfill to a minimum of 95 percent maximum density in accordance with 2-03.3(14)D. <br /> 2-02.4 Vacant <br /> Revise 2-02.4 as follows: <br /> 2.02.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> For curb and gutter cement removal with concrete pavement, the curb and gutter will <br /> be considered as pavement removal and the measurement for payment will be to the <br /> back of the curb. <br /> 2-02.5 Payment I <br /> Delete all paragraphs in 2-02.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> If there is no bid item to cover pavement removals, then they shall be included with the <br /> construction of the respective Work including, but not limited to, combined sewer pipe, <br /> water main, water service line, manhole, side sewer pipe, storm drain pipe, catch <br /> basins, and underground utility vaults. <br /> Include curb and gutter and sidewalk removal with construction of the respective Work <br /> including, but not limited to, combined sewer pipe, water main, water service line, <br /> manhole, side sewer pipe, storm drain pipe, catch basins, and underground utility <br /> vaults with no direct compensation made. <br /> If there is no pay item for pipe abandonment, then it shall be included with the <br /> construction of the respective Work including, but not limited to, sewer or storm drain <br /> pipe, water main, manhole, catch basin or side sewer with no direct compensation <br /> made. <br /> If there is no pay item for existing valve abandonment, then it shall be included with the <br /> construction of other items of Work with no direct compensation made. <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT <br /> 2-03.1 Description <br /> Supplement 2-03.1 by adding the following: <br /> This Work applies to street pavement patching and street reconstruction after <br /> completion of utility work. Grading for street reconstruction shall conform to COE I <br /> Water Main Replacement"W" Division 2—EARTHWORK April, 2022 <br /> WO No.—UP3766 SP—136 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.