My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 4-06.3(8) Anti-Stripping Additive I <br /> An anti-stripping additive shall be added to the asphalt binder material in accordance <br /> with Section 9-02.4 in the amount designated in a WSDOT mix design/anti-strip <br /> evaluation report for a dense graded hot mix asphalt design from the same gravel source <br /> within the last 24 months or as evaluated separately by an accredited lab using current <br /> WSDOT test methods (AASHTO T324 — Hamburg or WSDOT TM T718 — Modified <br /> Lottman). Alternately, the ATB may be evaluated for anti-strip additive using ASTM <br /> D3625 (Standard Practice for Effect of Water on Bituminous-Coated Aggregate Using <br /> Boiling Water) by an accredited lab. The anti-stripping additive required will be the <br /> minimum amount necessary to achieve a passing evaluation. <br /> 4-06.4 Measurement <br /> Delete all paragraphs in 4-06.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B —Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 4-06.5 Payment <br /> Delete all paragraphs in 4-06.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B —Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Water Main Replacement"W" Division 4—BASES April, 2022 1 <br /> WO No—UP3766 SP—146 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.