Laserfiche WebLink
ICITY OF EVERETT SPECIAL PROVISIONS <br /> • <br /> �._....�..,.,�.�_.�5-04.22 B.._�.�.... ._.WarmMix Asphalt �.�....Y..-„_..,�.�.-�.... ..,.�,-,..,... <br /> ( ) Using Process <br /> The Contractor may elect to use additives that reduce the optimum mixing <br /> Itemperature or serve as a compaction aid for producing HMA. Additives include <br /> organic additives, chemical additives and foaming processes. The use of <br /> Additives is subject to the following: <br /> Ia. Do not use additives that reduce the mixing temperature more than <br /> allowed in Section 5-04.3(6) in the production of mixtures. <br /> b. Before using additives, obtain the Engineer's approval using WSDOT <br /> I Form 350-076 to describe the proposed additive and process. <br /> 5-04.3 Construction Requirements <br /> 5-04.3(1) Weather Limitations <br /> IDo not place HMA for wearing course on any Traveled Way beginning October 1st <br /> through March 31st of the following year without written concurrence from the <br /> Engineer. <br /> IDo not place HMA on any wet surface, or when the average surface temperatures are <br /> less than those specified in Table 1, or when weather conditions otherwise prevent the <br /> proper handling or finishing of the HMA. <br /> I <br /> Table 1 - Minimum Surface Temperature for Paving <br /> ICompacted(Feet) Thickness Wearing Course Other Courses <br /> Less than 0.10 55°F 45°F <br /> I 0.10 to .20 0 0 <br /> 45 F 35 F <br /> IMore than 0.20 35°F 35°F <br /> I <br /> 5-04.3(2) Paving Under Traffic <br /> Apply the requirements of this Section when the Roadway being paved is open to <br /> traffic. <br /> Keep intersections open to traffic at all times, except; when paving the intersection or <br /> I paving across the intersection. During such time, and provided that there has been an <br /> advance warning to the public, the intersection may be closed for the minimum time <br /> required to place and compact the mixture. In hot weather, the Engineer may require <br /> I the application of water to the pavement to accelerate the finish rolling of the pavement <br /> and to shorten the time required before reopening to traffic. <br /> Before closing an intersection, place advance warning signs and signs marking the <br /> Idetour or alternate route. <br /> During paving operations, maintain temporary pavement markings throughout the <br /> project. Install temporary pavement markings on the Roadway prior to opening to <br /> Itraffic. Provide temporary pavement markings in accordance with Section 8-23. <br /> Include all costs in connection with performing the Work in accordance with these <br /> requirements, except the cost of temporary pavement markings, in the unit Contract <br /> Iprices for the various Bid items involved in the Contract. <br /> iWater Main Replacement"W" Division 5-SURFACE TREATMENTS April, 2022 <br /> WO No.-UP3766 AND PAVEMENTS <br /> ISP-149 <br />