My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> uniform temperature throughout the mixture. The length of the windrow for <br /> windrow elevator may be limited in urban areas or through intersections at the <br /> discretion of the Engineer. <br /> To be approved for use, provide an MTV meeting the following: <br /> 1. Self-propelled vehicle, separate from the hauling vehicle or paver. <br /> 2. Not be connected to the hauling vehicle or paver. <br /> 3. May accept HMA directly from the haul vehicle or pick up HMA from a <br /> windrow. <br /> 4. Ability to mix the HMA after delivery by the hauling equipment and prior to <br /> placement into the paving machine. <br /> 5. Ability to mix the HMA sufficiently to obtain a uniform temperature <br /> throughout the mixture. I <br /> To be approved for use, provide an MTD meeting the following: <br /> 1. Ability to be positively connected to the paver. <br /> 2. May accept HMA directly from the haul vehicle or pick up HMA from a <br /> windrow. <br /> 3. Ability to mix the HMA after delivery by the hauling equipment and prior to <br /> placement into the paving machine. <br /> 4. Ability to mix the HMA sufficiently to obtain a uniform temperature <br /> throughout the mixture. <br /> 5-04.3(3)E Rollers I <br /> Provide vibratory, oscillatory steel wheel rollers, or pneumatic tire type rollers, in <br /> good condition and capable of reversing without backlash. Operate roller in <br /> accordance with the manufacturer's recommendations. When ordered by the <br /> Engineer for any roller planned for use on the project, provide a copy of the <br /> manufacturer's recommendation for the use of that roller for compaction of HMA. <br /> Provide sufficient number and weight of rollers to compact the mixture in <br /> compliance with the requirements of Section 5-04.3(10). The use of equipment <br /> that results in crushing of the aggregate will not be permitted. Rollers producing <br /> pickup, washboard, uneven compaction of the surface, displacement of the <br /> mixture or other undesirable results will not be permitted. <br /> 5-04.3(4) Preparation of Existing Paved Surfaces <br /> Bring any irregular existing pavement surface or old base surface to a uniform <br /> grade and cross-section as shown on the Plans or approved by the Engineer. <br /> Accomplish preleveling of uneven or broken surfaces over which HMA is to be <br /> placed by using an asphalt paver, a motor patrol grader, or by hand raking, as <br /> approved by the Engineer. <br /> Provide compaction of preleveling HMA to the satisfaction of the Engineer and <br /> may require the use of small steel wheel rollers, plate compactors, or pneumatic <br /> rollers to avoid bridging across preleveled areas by the compaction equipment. <br /> Provide Engineer approved compaction equipment used for the compaction of <br /> preleveling HMA. <br /> Clean the entire surface of the pavement before construction of HMA on an <br /> existing paved surface. Entirely remove all fatty asphalt patches, grease <br /> drippings, and other objectionable matter from the existing pavement. Thoroughly <br /> clean all pavements or bituminous surfaces of dust, soil, pavement grindings, and <br /> other foreign matter. Fill all holes and small depressions with an appropriate class <br /> of HMA. Level and thoroughly compact the patched area surface. Obtain <br /> Engineer approval of the surface prior to the application of tack coat or paving. <br /> Water Main Replacement"W" Division 5—SURFACE TREATMENTS April, 2022 <br /> WO No.—UP3766 AND PAVEMENTS <br /> SP -152 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.