My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I SUBCONTRACTORS FORM <br /> 1. For heating, ventilation,air conditioning, plumbing (as defined by RCW Chap. 18.106) and electrical <br /> work (as defined by RCW Chap. 19:28), and structural steel installation and rehar installation, Bidder <br /> I MUST either identity itself or Subcontractors in the chart below. If Bidder believes such work is not <br /> part of the scope of Work,Bidder shall write"NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br /> I Subcontractors vaiy with bid alternates, in which case the Bidder must indicate which Subcontractor <br /> will be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating,ventilation, air conditioning, plumbing, electrical, structural steel installation and <br /> rebar installation,Bidder fails(1)to submit as part of the Bid the names of such Subcontractors, <br /> (2) to name itself to perform such Work, or(3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> I 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br /> electrical, structural steel installation and rehar installation subcontractors applies only to proposed <br /> heating, ventilation and air conditioning, plumbing, electrical, structural steel installation and rebar <br /> installation subcontractors who will contract directly with the general contractor submitting the Bid to <br /> the City, <br /> 5. The heating, ventilation and air conditioning,plumbing, electrical portions of the chart below must be <br /> I submitted with the bid proposal or within one hour of the published hid submittal time. <br /> 6. The structural steel installation and rebar installation portions of the chart below must be submitted <br /> with the bid proposal or within forty-eight hours of the published hid submittal time. <br /> Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br /> HEATING <br /> I Subcontractor, bidder or"no work" MUST be . O o vt< <br /> stated <br /> VENTILATION AND AIR CONDITIONING <br /> ISubcontractor,bidder or"no work"MUST be stated 1 v� 'l D l ,�1Iv}D Y K-{ <br /> PLUMBING (as described in RCW Chap. 18.106) <br /> Subcontractor,bidder or"no work" MUST be O , }� <br /> stated 0� <br /> ELECTRICAL(as described in RCW Chap. <br /> 19.28) <br /> Subcontractor, bidder or "no work" MUST be I stated 1� VOA(' <br /> 1���� <br /> 1 v V <br /> STRUCTURAL STEEL INSTALLATION <br /> Subcontractor,bidder or"no work" MUST be Qti{ <br /> statedi Ueda <br /> ex yUG�D� <br /> REBAR INSTALLATION <br /> Subcontractor, bidder or"no work" MUST he Q u 1 C�,U 'V/� I 'o� <br /> stated lX t t � " <br /> I <br /> IWater Main Replacement"W" Division P- PROPOSAL April,2022 <br /> WO No.-UP3766 SP--21 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.