Laserfiche WebLink
CITY OF EVERETT,WASHINGTON <br /> CONTRACT <br /> St <br /> THIS CONTRACT is made and entered into this .4 day of 'S , 20P4. by and between <br /> the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br /> Washington (the "City") and Q V iLeeo p X Cp►V ATI oo .t3C , a <br /> (A)PS N I oa-ro►-1 Co o f 2Ai o f ( "Contractor"). <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to furnish <br /> all labor, tools, materials, equipment, and supplies required to build and construct and to build and <br /> construct in a workmanlike manner the work, improvements, and appurtenances in accordance with the <br /> Specifications and Plans and all other Contract Documents entitled: "Water Main Replacement "W"" (the <br /> "Project"). <br /> 1. Contract Documents. This Contract is the written agreement signed between the City and Contractor <br /> and includes Division C — CONTRACT, Division P - PROPOSAL, Division B — BID ITEM <br /> DESCRIPTIONS, Special Provisions, Contract Plans, Standard Specifications, Standard Plans in effect <br /> as of the date Bids are opened, Addenda, supplemental agreements, change orders, certifications and <br /> affidavits required by this Contract and by law, and Federal requirements that apply to this Contract and <br /> Project,all of which are referred to as the"Contract Documents"and all of which are hereby incorporated <br /> by reference. <br /> 2. Contract Time. Substantial completion shall be achieved within sixty (60) working days after the <br /> effective date of the Notice to Proceed. Physical completion shall be within fifteen (15) working days <br /> after the actual date of issuance of substantial completion. <br /> 111 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional expense <br /> in the event that the Contractor does not complete the work in all respects and have it ready for use by the <br /> substantial completion date stated. Because it is difficult to accurately compute the amount of such costs <br /> and damages, the Contractor hereby covenants and agrees to pay to the City liquidated damages as <br /> computed in Section 1-08.9 of the Standard Specifications, as may be amended by the Special Provisions, <br /> ' for each and every working day required to accomplish substantial completion of the work in excess of <br /> the period established above for substantial completion. For overruns in contract time occurring after the <br /> physical completion date, liquidated damages shall be assessed at the rate computed in Section 1-08.9 of <br /> the Standard Specifications, as may be amended by the Special Provisions, until the work is physically <br /> complete. <br /> 4. Contract Sum. The amount of this Contract is ' 1 g1-13 150.01� <br /> ' ($ ) and is based on the proposal/bid submitted by Contractor dated <br /> 5_ O3 -n and is inclusive of$ (46, 034.5a of Washington state sales tax[Addendum il. The <br /> basis for final payment will be the actual amount of work performed according to the Contract Documents <br /> and payments, whether partial or final, shall be made as specified therein. <br /> 5. Withholding. Five percent (5%) of amounts due Contractor shall be retained and withheld to ensure <br /> to comply with RCW Chap. 60.28. Retained amounts shall only be released: (A) as required by law or <br /> (B) sixty (60) days after completion of all contract work if there are no claims against the retained funds. <br /> In addition to the amounts required by RCW 60.28 to be withheld from the progress or retained percentage <br /> payments to the Contractor, the City may, in its sole discretion, withhold any amounts sufficient to pay <br /> any claim against the Contractor of which the City may have knowledge and regardless of the informalities <br /> of notice of such claim arising out of the performance of this Contract. The City may withhold the amount <br /> until either the Contractor secures a written release from the claimant, obtains a court decision that such <br /> Water Main Replacement "W" Division C -CONTRACT April, 2022 <br /> Work Order# UP3766 SP—27 <br />