CITY OF EVERETT SPECIAL PROVISIONS <br /> Failure of the Contractor to perform all of the Contractor's obligations under the Contract <br /> shall not bar the City from unilaterally certifying the Contract complete so the Engineer <br /> may calculate a final contract price as provided in 1-09.9 PAYMENTS. <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor <br /> Delete 1-05.13. <br /> 1-05.14 Cooperation With Other Contractors <br /> Delete all of 1-05.14 and substitute the following: <br /> ' Nothing in the Contract shall be interpreted as granting to the Contractor exclusive <br /> occupancy of the Project area. The Contractor shall ascertain to its own satisfaction the <br /> scope of the Project and the nature of any other contracts that have been or may be <br /> awarded by the City in the construction of the Project, or to the end that the Contractor <br /> may perform this Contract in the light of such other contracts, if any. <br /> The Contractor shall not cause unnecessary hindrance or Delay to others working on <br /> ' this or other projects. If the performance of a contract for the Project is likely to be <br /> interfered with by the simultaneous performance of some other contract or contracts, the <br /> Engineer will decide which Contractor shall cease Work temporarily and which <br /> Contractor shall continue, or whether the Work under the contracts can be coordinated <br /> so that the contractors may proceed simultaneously. On all questions concerning <br /> conflicting interest of contractors performing related Work, the decision of the Engineer <br /> shall be binding upon all contractors concerned and the City, the Engineer, the City's <br /> Representative, and their consultants shall not be responsible for any damages suffered <br /> or extra costs incurred by the Contractor resulting directly or indirectly from the Award or <br /> performance or attempted performance of any other contract or contracts on the Project <br /> or caused by a decision or omission of the Engineer respecting the order of precedence <br /> in the performance of the contracts. <br /> If, through acts of neglect on the part of the Contractor, any others suffer loss or damage <br /> on the Work, the Contractor agrees to resolve such loss or damage fairly and <br /> expeditiously. If such other shall assert any claim against the City, the Engineer, the <br /> City's Representative, or their consultants on account of any damage alleged to have <br /> been so sustained, the City shall notify the Contractor, who shall hold harmless, <br /> indemnify, and defend the City, Engineer, the City's Representative, and their <br /> consultants, and each of their directors, officers, employees, and agents against any <br /> such claim, including all attorney's fees and any other costs incurred by the indemnified <br /> parties relative to any such claim. <br /> The Contractor shall coordinate its work with other contractors and utility companies that <br /> may have facilities in the Project area and cooperate with them. The Contractor shall <br /> also coordinate its activities with the City; and no water mains, individual water services, <br /> street, or private driveways may be closed off without a minimum of five working days <br /> notice to the City and the private property owner. Should the property owner or the City <br /> have adequate reason, as determined by the Engineer, to avoid access or water service <br /> shutoff at the scheduled time, the Contractor shall reschedule its work to meet the new <br /> condition. <br /> Final grading to subgrade and subgrade preparation in those areas disturbed by the <br /> utilities companies shall be the responsibility of the Contractor and included in the street <br /> construction and no additional compensation will be paid. <br /> The Contractor shall cooperate with the utility companies and their subcontractors and <br /> so conduct its operations that the necessary construction of their facilities can be <br /> accomplished to the mutual satisfaction of the City of Everett and the utility companies. <br /> Water Main Replacement"W" Division 1 -GENERAL REQUIREMENTS April,2022 <br /> WO No.-UP3766 SP-67 <br /> 1 <br />