Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-06.2(2)D Quality Level Analysis <br /> 1 Delete 1-06.2(2)D. <br /> 1-06.3 Manufacturer's Certificate of Compliance <br /> Supplement 1-06.3 by adding the following: <br /> When authorized by the Standard Specifications or these Special Provisions and prior <br /> to use, the Engineer may accept certain Equipment on the basis of a Manufacturer's <br /> Certificate of Compliance as an alternate to Equipment inspection and testing. <br /> A Manufacturer's Certificate of Compliance shall be reserved for cases where <br /> compliance to Contract requirements is not readily determinable through inspection and <br /> testing of materials or Equipment. The Contractor shall provide properly authenticated <br /> documents to the City's Representative that the materials and Equipment comply with <br /> the Contract requirements. <br /> The Contractor shall pay all associated costs of providing each Manufacturer's <br /> Certificate of Compliance submitted for City acceptance. <br /> The City reserves the right to refuse to accept Equipment on the basis of a <br /> Manufacturer's Certificate of Compliance. <br /> ' 1-06.3(1) Inspection at Point of Manufacturing <br /> (******) <br /> The Contractor shall be responsible to reimburse the City for the costs of inspections at <br /> the point of manufacturing for inspections occurring outside of Whatcom, Skagit, Island, <br /> Snohomish, King, Pierce and Thurston counties. Costs to be paid or reimbursed by the <br /> Contractor include, but are not limited to, travel, subsistence, labor and lodging <br /> ' expenses of the City Inspector. <br /> Point of manufacturing inspection will be required if: <br /> Inspection and testing of materials or Equipment in the vicinity of the Work by the <br /> ' City is not practicable, <br /> The Contractor requests the City to inspect and test material or Equipment at the <br /> point of manufacture, or <br /> The Standard Specifications or these Special Provisions require that inspection, <br /> testing or witnessing of tests take place at the point of manufacture. <br /> 1-06.4 Handling and Storing Materials <br /> ' Supplement 1-06.4 by adding the following: <br /> Contractor shall store materials and Equipment so as to insure the preservation of their <br /> quality and fitness for the Work. Contractor shall store Equipment and materials at <br /> location that facilitates inspection. The Contractor shall be responsible for damages, <br /> loss or casualty occurring to materials and Equipment until Final Acceptance. <br /> 1-06.6 Recycled Materials <br /> Delete 1-06.6 and its subsections and substitute the following: <br /> The Contractor shall make best effort to utilize recycled materials in the construction of <br /> the project as detailed in elsewhere in the Standard Specifications and these Special <br /> Provisions. <br /> Prior to Physical Completion Contractor shall report the quantity of recycled materials <br /> utilized in the construction of the project for each of the items listed in Section 9-03.21. <br /> Include hot mix asphalt, recycled concrete aggregate, recycled glass, steel furnace slag <br /> and other recycled materials (e.g. utilization of on-site material and aggregates from <br /> concrete returned to the supplier). Contractor shall provide report on DOT form 350- <br /> 075A Recycled Materials Reporting. <br /> ' Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April, 2022 <br /> WO No.—UP3766 SP—73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.