My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY HOPEWORKS STATION 2 2022-08-12
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
3315 BROADWAY HOPEWORKS STATION 2 2022-08-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 10:29:16 AM
Creation date
8/11/2022 8:18:23 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/2/2022 City of Everett Page <br /> 11:09:36AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B2002-014 Site Address 3315 BROADWAY <br /> Applied 2/11/2020 Applicant SCOTT NELSON Lot <br /> Approved 2/11/2020 Owner HOPEWORKS STATION SOCIAL ENT Block <br /> Issued 2/11/2020 Contractor KIRTLEY COLE ASSOC LLC Tract <br /> Parent Permit No. Description REPLACE DRYWALL/FINISHES IN LEAK AFFECTED(10)UN] <br /> Notes PART OF FIRST FLOOR <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 2/14/2020 2/14/2020 BLDG DWF PARTIAL APPR Contractor:206-280-9979 <br /> 11-INSULATION AM inspection requested <br /> (2/14/2020 3:27 PM DWF) <br /> Units 409,309,310 and 210. <br /> Ok to cover. <br /> All ceilings,ok to cover (insulation <br /> /drywall). <br /> Other units not ready. <br /> Need to complete fire protection between <br /> units and at floor/ceiling penetrations. <br /> 2/20/2020 2/20/2020 BLDG KMK APPROVAL as noted AM Inspection requested <br /> 10-INTERIOR 206-280-9979 <br /> (2/20/2020 8:11 AM KMK) <br /> As noted:Obtain all required permits and <br /> inspection approvals before cover. <br /> (2/20/2020 11:21 AM KMK) <br /> Ok to cover framing as noted: <br /> Verify electrical rough in inspection is <br /> complete. <br /> 3/13/2020 3/13/2020 BLDG 15-FINAL KMK CORRECTION need sub permit 253-302-1653 <br /> finals <br /> 9/25/2020 9/25/2020 PERMIT KLC APPROVAL COVID 19 <br /> EXTENSION EXTENSION <br /> 3/15/2021 3/15/2021 PERMIT KLC EXTENSIONA COVID <br /> EXTENSION EXTENSION <br /> 7/19/2021 7/19/2021 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> INSP12 CRIfirsYSTE <br />
The URL can be used to link to this page
Your browser does not support the video tag.