Laserfiche WebLink
7/11/2022 City of Everett Page 3 f 1 <br /> 7:04:01AM <br /> INSPECTION ACTIVITY REPORT <br /> 5/17/2022 5/17/2022 ELEC 06-ROUGH SKB PARTIAL APPR 5/12/2022 4:05 PM DADZ ELECTRICAL <br /> IN SERVICE LLC <br /> Morning inspection please.Please call <br /> Patrick at number provided for access 45 <br /> min prior to arrival.If he doesn't answer <br /> please call Matt at 425-870-8109. <br /> Contact Name:DADZ ELECTRICAL <br /> SERVICE LLC <br /> Site Address:2313 EVERETT AVE <br /> Phone:3604412457 <br /> e-Mail:dadzelectric@gmail.com <br /> (5/17/2022 11:27 AM SKB) <br /> OK Rough in unit#3 only except for attic. <br /> No ladder on site we need to see in attic for <br /> Ruffin.Have ladder on site for next <br /> inspection. <br /> 5/23/2022 5/23/2022 ELEC 06-ROUGH SKB PARTIAL APPR eTRAKiT Inspection 5/20/2022 8:36 AM DADZ ELECTRICAL <br /> IN Request SERVICE LLC <br /> Just for unit#3,Ladder will be on site for <br /> inspection of attic.Matthew will also be <br /> there to allow for access.AM inspection <br /> please around 10 if possible.Thank you! <br /> Contact Name:DADZ ELECTRICAL <br /> SERVICE LLC <br /> Site Address:2313 EVERETT AVE <br /> Phone:4258708109 <br /> e-Mail:dadzelectric@gmail.com <br /> (5/23/2022 10:36 AM SKB) <br /> Unit#3.Ok rough in. <br /> 5/23/2022 5/23/2022 ELEC 05-SERVICE SKB APPROVAL eTRAKiT Inspection 5/20/2022 8:33 AM DADZ ELECTRICAL <br /> Request SERVICE LLC <br /> Corrections have been made.Labels for <br /> service are still in production so in the <br /> meantime we have written them in sharpie <br /> marker so we could pass inspection.I can <br /> send pictures or inspector can confirm with <br /> future inspections of the installation of <br /> permanent labels.We just need PUD to <br /> hookup power ASAP so we need the service <br /> passed.Please call Matt at above number <br /> for any questions or issues.AM inspection <br /> please around 10 if possible.Thank you! <br /> Contact Name:DADZ ELECTRICAL <br /> SERVICE LLC <br /> Site Address:2313 EVERETT AVE <br /> Phone:4258708109 <br /> e-Mail:dadzelectric@gmail.com <br /> (5/23/2022 10:36 AM SKB) <br /> 4 gang meter pack with one house panel <br /> line sides OK, check feeders, unit three <br /> OK. <br /> 6/9/2022 6/9/2022 ELEC 10-FINAL SKB PARTIAL APPR AS Noted (6/9/2022 11:34 AM SKB) <br /> Partial final unit 3.contractor fixing 3 way <br /> switch at the bottom of the stairs for <br /> illuniation of stairs. <br /> 1NSP12 0214fs YS-TEM <br />