Laserfiche WebLink
/ \ <br /> / \ <br /> / \ <br /> / \ <br /> SEALANT <br /> EXISTING FLUE PIPE <br /> NEW 24 GA. GALVANIZED <br /> STEEL RAIN COLLAR <br /> O STAINLESS STEEL <br /> BAND CLAMP <br /> NEW 24 GA. GALVANIZED <br /> STEEL STACK FLASHING EXISTING SHEET METAL <br /> STACK FLASHING <br /> // <br /> — NEW TPO ROOF SYSTEM <br /> HEAT WELD SEAMS <br /> 2-PIECE TPO MEMBRANE <br /> FLASHING <br /> #14 SCREW AT 6" O.C. <br /> nnn�k� <br /> \\\ \\\\\ \\\\\ \\\\\ \\\ \\\ \ '/�///// // //// / / / ///// / / / / /// /// / <br /> NOTES: <br /> 1) PAINT EXPOSED FLUE PIPE WITH RUST-OLEUM PAINT <br /> PROJECT: Iron Mountain <br /> 6600 Hardeson Road <br /> 11IRD&I Everett, WA <br /> Roof Design & Inspection, Inc. FLUE VENT / HOT PIPE <br /> 1115 Tucker Road I Dartmouth, MA 02747 <br /> tel 508.965.1793 I www.roofdesignandinspection.com D1L 0 6 DATE: 01/02/22 <br /> SCALE: N.T.S. <br /> Il2- <br />