Laserfiche WebLink
C C civil &structural • <br /> ENGINEERING <br /> engineering &planning <br /> June 4, 2020 <br /> Jeff Heilman <br /> City of Everett <br /> Permit Services <br /> 3200 Cedar Street, <br /> 2nd Floor, <br /> Everett,WA 98201 <br /> RE: Permit Number: B2004-039 <br /> Project Name: Baugh/Floyd Residence Addition <br /> Project Address: 5319 Sound Avenue, Everett,WA 98203 <br /> CG Project Number: 19424 <br /> Dear Mr. Heilman, <br /> Itemized below is our response to the review comments dated May 19th 2020 for the above referenced <br /> project. Our response appears in bold. <br /> 6. Please provide architectural and structural details for the proposed guard system at all locations <br /> guards are required per section R312. Include existing and proposed decks, balconies,stairs and <br /> landings. Provide details for attachment of the guard system to the structure(s). <br /> The non-wood guardrail systems will be designed by the manufacturer. Refer to the revised <br /> details on sheet A3.3 for the wood guardrails and the attachment of the non-wood guardrails <br /> to the structure. <br /> 7. On Detail 5/S5.2, a callout indicates that "Refer to Structural Notes For Anchorage To Wall <br /> Continuous". However,the brick anchorage appears to be missing from the Structural Notes. <br /> Please clarify. <br /> We have added veneer attachment structural notes to sheet 51.1 of the structural drawings on <br /> the updated drawings dated 06.05.2020.The brick veneer steel angle attachments are specified <br /> in details 1/S4.1, and 5-10/55.2 <br /> If you have any questions or comments regarding the responses to this review, please do not hesitate to <br /> call. <br /> Sincerely, <br /> CG Engineering <br /> 244, 744a....„„ <br /> Mike Maechler, PE, SE <br /> Project Manager <br /> 250 4th Avenue South,Suite 200 <br /> Edmonds,WA 98020 <br /> ph.425.778.8500 I f.425.778.5536 <br /> www.cgengineering.com <br />