My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11625 AIRPORT RD 2018 Plans 2022-11-07
>
Address Records
>
AIRPORT RD
>
11625
>
Plans
>
11625 AIRPORT RD 2018 Plans 2022-11-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2022 10:56:42 AM
Creation date
8/16/2022 2:14:49 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11625
Permit
PW1808-010
Year
2018
Notes
ADDITION OF A 94-SPACE PARKING LOT FOR EXISTING CHURCH USE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />r µ" <br />O�Orr <br />r <br />r <br />005379000051 }01 <br />1 #96---]> <br />AFIV 9705140176 <br />�q � <br />r <br />r i <br />4 e <br />0 i <br />F <br />e <br />CAUTION.• <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br />PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION, THIS SHALL INCLUDE <br />CALLING UTILITY LOCATE @ 1-800-424-5555 POTHOLING ALL OF THE EXISTING <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY <br />WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN <br />ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND <br />ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR <br />SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL <br />PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />114, SE 114, SEC 23, T.28N.®04 <br />SNOHOMISH COUNTY, WASHINGTON <br />S,`iMr1 f?I;tJ=�,38. ;car <br />SD1.tH R?1,1.-=1'38.12 <br />F.H. <br />1 <br />J <br />f <br />I <br />/ <br />1 <br />1 <br />f <br />/ <br />I <br />/ <br />l <br />/ <br />NOTES: <br />CESCL CONTACT INFORMATION MUST BE SUBMITTED <br />TO CITY INSPECTOR PRIOR TO ANY WORK. <br />THE 13 ELEMENTS OF TESL' E FL <br />ELEMENT #1 — MARK CLEARING LIMITS: <br />LIMIT OF CONSTRUCTION ARE CLEARLY MARKED. <br />ELEMENT #2 — ESTABLISH CONSTRUCTION ACCESS: <br />A STABILIZED CONSTRUCTION ENTRANCE IS SHOWN. <br />ELEMENT #3 — CONTROL FLOW RATES: <br />SEDIMENT TRAP WILL BE PROVIDED. <br />ELEMENT #4 — INSTALL SEDIMENT CONTROLS: <br />SILT FENCE AND INLET PROTECTION ARE PROPOSED. <br />ELEMENT #5 — STABILIZE SOILS: <br />SOIL STABILIZATION IS ACHIEVED BY PLASTIC COVERING AND SEEDS. <br />ELEMENT #6 — PROTECT SLOPES: <br />SLOPES ARE PROTECTED BY PLASTIC COVERING, MULCHING AND SEEDS. <br />ELEMENT #7— PROTECT DRAIN INLETS: <br />INLET PROTECTIONS ARE PROPOSED FOR THE STORM DRAINS. <br />ELEMENT#8 — STABILIZE CHANNELS AND OUTLETS: <br />OUTLET PROTECTIONS ARE PROPOSED. <br />ELEMENT #9 — CONTROL POLLUTANTS: <br />ALL VEHICLES, EQUIPMENT AND PETROLEUM PRODUCT <br />STORAGE/DISPERSING AREAS WILL BE INSPECTED REGULARLY TO <br />DETECT ANY LEAKS OF SPILLS, AND TO IDENTIFY MAINTENANCE NEEDS <br />AND PREVENT LEAKS OF SPILLS. <br />ELEMENT #10 — CONTROL DEWATERING: <br />THERE WILL BE NO DEWATERING AS PART OF THIS CONSTRUCTION <br />PROJECT. <br />ELEMENT #11— MAINTAIN BMP's: <br />ALL TEST BMPs SHALL BE MAINTAINED AND REPAIRED AS NEEDED. <br />ELEMENT # 12 — MANAGE THE PROJECT: <br />1 <br />Et. THIS COULD BE ACHIEVED BY MINIMIZING THE EXTENT AND DURATION <br />RACK � � .a EXPOSED AND EMPHASIZING EROSION CONTROL THEN <br />�'�� ��' � � OF THE AREA EXPOS BY OSI <br />SEDIMENT CONTROL. <br />r}' DUI tiii`IG tf 11 "�`ti 1°d£z — <br />If.<.,,i i( I\ :j.i, ��,� �rf� ELEMENT #13 — PROTECT ON —SITE STORMWATER MANAGEMENT BMP'S <br />1625 11RP'TJt,T ';c C ` ' # l t sr%�- m, FOR RUNOFF FROM ROOFS AND OTHER HARD SURFACES: NIA <br />ANY i(5s<7Sa'RUC-!3Ot Oil T HY5 <br />z90 j <br />OOJ 7Jv�50.J402 i "qy \ <br />a.GP+ t1 fSOa+Ai U..su <br />PAR 9 %,7�a� CURRENTrrY STAaaGADS <br />l 1 axgjR w u LErM <br />BLA 119'ITv ? 1G502_ �A I — — <br />1� AFiV 9705140176 `� v 7 `E ZA �a <br />SEDIMENT TRAP <br />INFLOW (10 YR124 HR) <br />SURFACE REQ'D <br />POND TOP ELEV <br />POND BOTTOM ELEV <br />EMERGENCY OVERFLOW <br />SPILLWAY ELEV= <br />SURFACE AREA PROVIDED <br />0.6185 cfs <br />1,288 SF <br />EL=497 <br />EL=492.5 <br />EL=496 (L=6 ) <br />1,288 SF (EL=496) <br />CITY STREETS ARE TO BE KEPT CLEAN OF DIRT <br />AND DEBRIS AT ALL TIMES DURING CONSTRUCTION. <br />DUST SUPPRESSION AND STREET CLEANING MUST <br />OCCUR AS DIRECTED BY PUBLIC WORKS <br />INSPECTOR. <br />ALL EXPOSED GROUND MUST BE RESEEDED WITHIN <br />30 DAYS OF COMPLETION OF CONSTRUCTION. IF <br />RESEEDING IS NOT PRATICAL DUE TO WEATHER OR <br />SEASONAL PROBLEMS, THE GROUND MUST BE <br />COVERED WITH MULCH AS DIRECTED BY THE CITY <br />ENGINEER. <br />TEMPORARY EROSION CONTROL MEASURES FOR <br />CONSTRUCTION ACTIVITY MIDST BE OPERATIONAL <br />PRIOR TO COMMENCEMENT OF ANY CLEARING OR <br />EARTHWORK. <br />
The URL can be used to link to this page
Your browser does not support the video tag.