Laserfiche WebLink
I <br />C) <br />6_5 <br />Lu <br />9 <br />COOLER WALL <br />STL ANGLE ATTAGHM'T TO <br />GONG SLAB PROVIDED BY <br />COOLER MANUFAGTURER <br />SLOPE T NIDE GONG. 2% <br />ANAY FROM COOLER, 5 SIDES <br />FOR DRAINAGE, SEAL BOTTOM <br />AS REGOMMENDED BY COOLER <br />MANUF, INSTALL, INSTRUCTION. <br /># #5 ANGLE BAR AT Ib OG <br />5 <br />'C E AR AT I <br />'y <br />214'' HORIZ. MIN, X <br />(2' <br />A <br />18 11 0 <br />)1100 <br />4 BAR AT 5 --E- H DR. <br />11 C <br />" GONG, 5LA <br />ON MAIN 4 GONG <br />5 <br />4'' PERF. FOUND. DRAIN KITH <br />SET FOOTING AND SLAB ON <br />UNDISTURBED SOIL OR 501L <br />THAT HAS BEEN COMPACTED <br />TO q5% PER A5TM D- 15511 — <br />141 MIN. <br />ffkm0 SCALE: 1 1/2" = 1'-0" <br />AT FREEZER, INSTALL IN5UL <br />FLOOR NITH RAMP PROVIDED <br />BY COOLER MANUF, <br />AT GOOLER, SLAB TO BE <br />GON5TRUGTED 5/4" BELON <br />FIN15HED FLOOR 50 THAT <br />QUARRY TILE HILL BE FLUSH <br />KITH EXISTING KITGHEN FLOOR <br />PROVIDE #4 BARS AT Ibll OG <br />EACH DIRECTION <br />4" GONG SLAB OVER 6 MIL <br />BLACK VAPOR BARRIER OVER <br />4" GRANULAR FILL OVER <br />UNDISTURBED 501L OR SOIL <br />THAT HAS BEEN GOMPAGTED <br />TOP q5% PER ASTM D-155i <br />4, c"a <br />1e <br />ik'z <br />irn <br />1 v <br />I <br />71 <br />X <br />o i" r Q� J111 <br />- <br />'q <br />'14 <br />5 <br />8, jx <br />1_71 r <br />u_ <br />rv, <br />cz' <br />7 <br />7�� '2� 'U <br />vti <br />n 8 h, !u c a L 23, ricre-�� -'joli -75 <br />E CAS' W-PLAA, ltE;A-'-`- hi IMPaPET <br />�7� 7" <br />F E '-�_fEz F 7 <br />rn" <br />ce, ri-k�u",.-,'� <br />J5 c_c T�ad <br />N C <br />T; <br />7�v'n �n' o", 1 n�a <br />r, ??i <br />"I <br />I E, IR' A�11111'_;' C�t cj r4 J& 0" C"a <br />A <br />7 <br />7'EA <br />F' <br />kil ini-,vae <br />�L' <br />M� C mr o" <br />G,0RElE <br />7ic.1 Z t <br />A <br />� l:� <br />u' 'ez <br />irs en <br />a75" AIR GAP BETNEEN <br />BRICK FACE AND GOOLER <br />MALL PER MANUF, <br />bXb QUARRY TILE TO >0� <br />MATCH KITCHEN <br />A& 2 OVERLAP "MIN. TYP <br />lop,NON-SHRINK GROUT > < <br />BELON STL ANGLE NHERE <br />GONG SLOPES Al/\,AYFROM </ <br />COOLER >1 <br />4 <br />G< <br />— — — — — — — — -- zn , <br />ocvc 000 <br />0 0 b 1 0 <br />00 �3 <br />00 <br />0 4, <br />4. <br /><1 <br />0 <br />4 lj <br />0 <br />7- <br />0& 0. <br />cl — <br /><1 <br />#5 AN LE BAR AT 18 OG <br />24" HORIZ. MIN, N1 SIMP50N <br />SET EFOXY EMBED. TO EXIST. <br />2 <br />FT6, I A <br />1211 __T <br />11 11111111111111120 MR, "ll ill 01-4 mam <br />'%Mff SCALE: 1 1/2" = 1 '-T <br />NOTE: <br />GONGRETE SLAB SHALL BE FLAT <br />DIREGTLY BELOW THE GOOER LIMITS. <br />THE J" EXTEN51ON SHALL BE SLOPED 2% <br />AWAY FROM THE COOLER KkI5. 5TL <br />AN6LE GONWGTOR5 SHALL HAVE NON - <br />SHRINK GROUT TO ABSORB THE SLOPE <br />BELOW THE AN6LE. <br />me <br />NOTE: <br />6ENEPAL GONTRAGTOR SHALL GON4�1�� <br />DEPTH OF SECONDARY GOCUIT5 FROM <br />TRAN5FORM5ER TO ENTRANGE CABINET AND <br />IF <18" BELON BOTTOM OF FOOTING, GONTAGT <br />AR6HITEGT OR GON5T. MC-R FOR DIRECTION. <br />VERIFY WITH GITY IN5PEGTOR THAT rON5TRJGTIN6 <br />FOUNDATION OVER E)(15T. 5EGOKDARY CONDUITS <br />15 AGGEPTABLE, PRIOR TO INSTALLATION. <br />SEE SITE PLAN FOR GONTINUATION. <br />§!F <br />SCALE: 1 1/2" = l'-O" <br />SCALE: 1/4" = V-0" <br />SLAE3 SHALL BE INSTALLED <br />FLAT BELON GOOLER UNIT <br />REFER TO SECT. EVA53 <br />FOR REBAR GALLOUT5 <br />FACE OF EX. BRICK <br />.75" PER COOLER MF <br />SEE PLAN AND COORD. OPENING WITH <br />SHOP ON65 OF COOLER AND FLOOR PLAN <br />DIMEN510�ED OPENIN6 <br />ISSUE DATE: 03/29/2017 <br />PROJECT NUMBER: 17-4022 <br />DRAWN BY: <br />CHECKED BY: HGK <br />�8-27-2018 <br />HOWARD G. KIMURA <br />STATE IF VAWNMI <br />