Laserfiche WebLink
FLOOR LIVE LOAD (OFF 1 GES) . . .............. .. <br />.... ............ . 50 P5F OR 2,000 L65. <br />FLOOR LIVE LOAD (ASSEMBLY) . .. .................. <br />.. .. ....... .100 PSF OR 1,000 L a <br />FLOOR LIVE LOAD (LIGHT STORAGE/EXHIBIT) . .... .... <br />.. .. .... ........ .. .. .. .... .125 P5F. <br />FLOOR LIVE LOAD (RETAIL) .............. I ......... <br />I .. I ....... .100 P5F OR 1,000 L55. <br />STAIR AND EXITS LIVE LOAD . .. ........ .............. <br />:. ....... . 100 P5F OR 1,000 L55. <br />6UARDRAIL5/E3AL6ONY RAILS (EXIT FACILITY) . .............. <br />.... ...... .50 PLF OR 200 LBS. <br />MECHANICAL UNITS . .... .... ............ .......... <br />. HEIGHTS FURNISHED BY MANUFACTURER <br />SNON ............ .......... .... .... .......... <br />.... . . ROOF SNOW LOAD = 2b P5F <br />.. ...... .... .... .... I ....... .. ............ <br />...... . IMPORTANCE FACTOR Is = 1.1 <br />NIND. .........ANALY515 PROCEDURE: ASGE 1-10 CHAPTER 21 "PART II - ENGLOSED 51MPLE DIAPHRAGM" <br />. .. .. .... ...... .. .. .... ........ .... ...... <br />I ... .... .. .. .. . . R15K CATEGORY I I I <br />................ :............. ........ <br />........................ .115MPH <br />. .. ... ...... .. ........ .. .. <br />............. .. .. .. .. EXPOSURE 11511 <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . .TOPOGRAPHIC FACTOR Kzte 10.��.,. <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />NIND BASE SHEAR, NORTH/SOUTH Vw m,(155 K <br />.. .. .. ............ <br />WIND BASE SHEAR, EAST/HEST Vw 114 K� <br />CLADDING / WINDOW DE516N PRE55URE (MAX.) . .... ...... <br />.. .. .. .. ...... .... .. .. . 61 P5F <br />ROOFING DE516N PRE55URE NOT AT A CORNER (MAX.) . ........ <br />.. .. .... .... .. .. .. .. . a4 P5F <br />ROOFING DESIGN PRE55URE AT CORNER (MAX.) . ............................ <br />THE DESIGN NIND PRESSURES L15TED ABOVE ARE INNARD OR OUTNARD AND ARE BASED ON AN EFFECTIVE <br />NIND AREA OF 10 SQUARE FEET NEAR A BUILDING CORNER, U.O.N. CORNER AND OTHER ZONES ARE DEFINED <br />BY FIGURE 30.5-1 IN ASCE 1-10. REDUCED DESIGN PRE55URE5 MAY BE CALCULATED U51N6 ASGE 1. NOTE <br />THAT THE DESIGN NIND PRE55URE5 NOTED ABOVE ARE ULTIMATE VALUES PER THE 2015 IBC AND SHALL BE <br />MULTIPLIED BY 0.6 FOR ALLONABLE 5TRE55 DESIGN. <br />EARTHQUAKE. . .. ....... . . ANALY515 PROCEDURE: I156 "EQUIVALENT LATERAL FORCE PROCEDURES" <br />. . ........ .. .. ... ... .... .. ....... I .. . SEISMIC DESIGN CATEGORY (SDC) ® D <br />. .... .... .... . .. .. .. .. .... .. .. ............ .. .. .. .... . R15K CATEGORY o III <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SEISMIC SITE CLASS a D <br />......... .. .. .... ........ .. .. .. .... .... IMPORTANCE FACTOR Ic ® 1.25 <br />... .. .. .. .. .... .. . MAPPED MOE 55 m 1.32; 51 m O.5O <br />. .. ................ .... .. ...... .. .. .... . DE51ON ACCELERATION 5ds ® Oba; 5dl © 0.50 <br />MAIN BUILDING SEISMIC RE515TIN6 SYSTEM: STEEL DUCKLING -RESTRAINED BRACED FRAMES, R m �D.O <br />. . . . . . . . . . . . MEZZANINE 5E15MI6 RE515TIN6 5Y5TEM: HOOD PANEL BEARING SMEAR NALL, Pv ,®-4�; <br />..................................... 5E15MIG BASE SHEAR, V5 256 K <br />5EE PLANS FOR ADDITIONAL LOADING CRITERIA. P05T ALL COMMERCIAL OR INDUSTRIAL LIVE LOADS OVER <br />50 P5F PER IE36 SECTION 106. <br />5. LATERAL LOADS ARE TRANSFERRED BY THE ROOF AND FLOOR DIAPHRAGMS TO THE SHEAR NALLS <br />OR BRACED FRAMES. MOMENTS, SHEARS AND ROTATIONAL FORCES ARE BASED ON THE RIGIDITY OF EACH <br />SHEAR NALL OR BRACED FRAME AND ARE CARRIED BY THE SHEAR NALLS OR BRACED FRAMES TO THE <br />FOUNDATION. <br />4. STRUCTURAL PRANIN65 SHALL BE USED IN OONJUNCTION KITH ARCHITECTURAL DRAWINGS FOR <br />BIDDING AND CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMEN51ON5 AND CONDITIONS FOR <br />COMPATIBILITY AND SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO CONSTRUCTION. <br />5. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS, MEMBER SIZES, AND CONDITIONS PRIOR TO <br />COMMENCING ANY NORK. ALL DIMEN51ON5 OF EXISTING CONSTRUCTION SHONN ON THE DRANINGS ARE <br />INTENDED AS GUIDELINES ONLY AND MUST BE VERIFIED. <br />6. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE STRUCTURE AND STRUCTURAL <br />COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE KITH THE PLANS. <br />1. CONTRACTOR SHALL BE RE51F®N51BLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS, <br />TECHNIOUE5, SEQUENCES OR PROCEDURES REQUIRED TO PERFORM THEIR NORK. THE STRUCTURAL ENGINEER <br />HAS NO OVERALL, SUPERVISORY AUTHORITY OR ACTUAL, AND/OR DIRECT RE5PON51BILITY FOR THE SPECIFIC <br />NORKING OONDITIONS AT THE 51TE AND/OR FOR ANY HAZARDS RESULTING FROM THE ACTIONS OF ANY <br />TRADE CONTRACTOR. THE STRUCTURAL ENGINEER HAS NO DUTY TO INSPECT, SUPERVISE, NOTE, CORRECT, OR <br />REPORT ANY HEALTH OR SAFETY DEFICIENCIES OF THE ONNER, CONTRACTORS, OR OTHER ENTITIES OR <br />PERSONS AT THE PROJEGT SITE. <br />5. CONTRACTOR -INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ARCHITECT AND <br />5TRUC,TURAL ENGINEER FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHONN ON <br />SHOP DRAWINGS ONLY HILL NOT 5AT15FY TH15 REQUIREMENT. <br />q. ORANINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. NHERE CONDITIONS ARE <br />NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, 51MILAR DETAILS OF <br />CONSTRUCTION SHALL BE USED, SUBJECT TO REVIEN AND APPROVAL BY THE ARCHITECT AND THE <br />STRUCTURAL ENGINEER. NHERE INFORMATION ON THE DRAdNINGS 15 IN CONFLICT KITH THE SPECIFICATIONS, <br />THE MORE STRINGENT SHALL APPLY, SUBJECT TO REVIEN AND APPROVAL BY THE ARCHITECT AND THE <br />5 I CTURAL ENGINEER. DO NOT SCALE THE DRANINGS. <br />10. ALL STRUCTURAL 5Y5TEM5 NHICH ARE COMPOSED OF FIELD ERECTED GOMPONENTS SHALL BE <br />SUPERVISED BY THE SUPPLIER DURING MANUFACTURING, DELIVERY, HANDLING, STORAGE AND ERECTION IN <br />ACCORDANCE KITH INSTRUCTIONS PREPARED BY THE SUPPLIER. <br />1. 5HOP DRAViIN65 FOR REINFORCING 5TEEL (FOR BOTH (,ON( RETE AND MA50NRY rON5TRU( TION), <br />".)• BRACES, W PANEL5, METAL DECKING, GLUED LAMINATED MEMBERS, AND c <br />SHALL BE 5UBMITTED TO THE ARCHITECTD 5TRUCTURAL EN61NEER FOR <br />REVIEN PRIOR TO <br />FABRICATION <br />3 ENERAL 5TRUCTURAL N <br />,viing _.. <br />y unless 5hoyin othemise, on the, plam) <br />'12. SHOP ORANIN6 REVIEN: DIMENSIONS AND QUANTITIES ARE NOT REVIEV4ED BY THE ENGINEER OF <br />RECORD, AND THEREFORE MUST DE VERIFIED BY THE CONTRACTOR. CONTRACTOR 5HALL REvIEN AND <br />STAMP ORANIN65 PRIOR TO REVIEN BY EN61NEER OF RE( ORD, CONTRACTOR 5HALL REVIEIN DRAMIN65 <br />FOR CONFORMANCE AITH THE MEAN5, METHODS, TECHNIGUE5,5EOUENCE5 AND OPERATION5 OF <br />CONSTRUCTION, <br />..11 _ R .. *. r a .. - . PRE( <br />R AUTION5 AND <br />PROGRAMS <br />,rsA INCIDENTAL THERETO. <br />_ T , <br />13. Faye .R ... - ___ s . _D BY <br />THE = _- - ARE NOT CHANGE ORDERS. <br />OF SHOP DRANIN6 SUBMITTALS <br />BY <br />THE <br />1, <br />r 4 _ <br />T THE <br />CONTRACTOR UNDER5TAND5 THE DE516N CONCEPT, BY INDICATING NHIrH MATERIAL 15 INTENDED TO BE <br />FURN15HED AND INSTALLED AND BY DETAILING THE INTENDED FABR16ATION AND IN5TALLATION METHOD5. IF <br />DOCUMENTS ARE DISCOVERED EITHERPRIOR TO R AFTER OPDRAY41NO SUBMITTALS gym' PROCE55ED BY <br />4. DEFERRED 5UE3MITTAL5 OF DESIGN BUILD GOMPONENT5 SHALL BEAR THE STAMP AND SIGNATURE OF A <br />STATE OF NA5HINGTON RE615TERED O,_ APPROVED BY THE <br />COMPONENT DESIGNER PRIOR TO CURSORY REVIEN BY THE ENC71NEER OF RECORD FOR LOAD5 IMP05ED ON <br />THE BA51G STRUCTURE. THE COMPONENT DE516NER 15 RESPONSIBLE FOR CODE CONFORMANCE AND AL_ _ O _ i <br />NS NOT SPECIFICALLY GALLED OUT ON ARCHITECTURAL OR 5TRUGTURAL DRANIN65. <br />DEFERRED T MAGNITUDE AND DIRECTION OF ALL LOAD5 IMPOSED ON BA516 <br />STRUCTURE AND SHALL INCLUDE DE516N O- <br />THE FOLLONIN6 COMPONENTS SHALL BE DEFERRED 5UBMITTAL5 FOR TH15 PROJECT: <br />6UARDRAIL5, BUCKLING RESTRAINED BRACED FRAME5,5TAIR5, EXTERIOR CLADDING, CRANE FArADE, AND <br />7s <br />N _rNi <br />.. . <br />b. FOUNDATION NOTES: 506RADE PREPARATION INCLUDING DRAINAGE, EXCAVATION, COMPACTION, <br />AND <br />FILLING <br />-.,w w -. ! _.. .. _ -. .' .._ k;LL CONFORM STRICTLY <br />' %:- 1%5 <br />_ <br />GIVEN IN <br />6EOTECHNICAL REPORT OR AS DIRECTED BY THE GEOTE6HNI6AL ENGINEER. FOOTIN65 SHALL BEAR ON <br />50LID UND15TURBED EARTH (CONTROLLED, COMPACTED STRUCTURAL FILL OR BOTH) AT LEAST 0" BELOA <br />MINIMUM AN12 FOR GUIDANCE ONLY; THE ACTUAL ELEVATIONS OF FOOTIN65 MU5T BE ESTABLISHED BY THE <br />CONTRAGTOR IN THE FIELD NORKIN6 NITH THE TESTING LAB AND 6EOTF-GHNIGAL ENGINEER, UNLE55 <br />OTHERA15E NOTED, FOOTIN65_ w CENTERED UNDER <br />BACKFILL BEHIND ALL RETAINING NALL5 AITH FREE DRAINING GRANULAR FILL AND PROVIDE FOR <br />SUBSURFACE DRAINAGE AS NOTED IN THE 6EOTEGHNIGAL REPORT. <br />t ►Jrtl--= 1.,.. <br />A. FOOTINGS, 5,000 P51 511 5-1/2 SACKS 1-1/411 <br />SLAJ55-0-6RADE, <br />TOPPING 5LA55 <br />B. 5LAB5 ON METAL 5,000 P51 511 <br />5-1/2 5ACK5 3/411 <br />DECK, STAIR <br />LANDINGS <br />AND TREADS <br />6. ALL STRUCTURAL 4,000 P51 411 6-1/2 SACKS 5/411 <br />CONCRETE EXCEPT <br />NALLS <br />D. CONCRETE NALLS 4,000 P51 511 6-1/2 SACKS 5/41' <br />MIXES SHALL BE PROPORTIONED 50 A5 NOT TO EXCEED THE MAXIMUM SLUMPS INDICATED (BEFORE THE <br />ADDITION OF ADMIXTURES). THE HATER/CEMENT RATIO SHALL NOT EXCEED 0.55 FOR FOOTINGS AND 0.45 <br />FOR ALL SLABS AND EXPOSED CONCRETE. <br />THE MINIMUM AMOUNT OF CEMENT AND THE MAXIMUM SLUMP MAY BE CHANGED IF A CONCRETE PERFORMANCE <br />MIX IS SUBMITTED TO THE STRUCTURAL ENGINEER AND THE BUILDING DEPARTMENT FOR APPROVAL TWO <br />NEEKS PRIOR TO PLACING ANY CONCRETE. (THE N/C RATIO LIMITS STILL APPLY). THE PERFORMANCE MIX <br />SHALL INCLUDE THE AMOUNTS OF CEMENT, CEMENTITIOU5 MATERIAL, FINE AND COARSE AGGREGATE, NATER <br />AND ADMIXTURES AS DELL AS THE TER/CEMENT RATIO, SLUMP, CONCRETE YIELD AND SUBSTANTIATING <br />STRENGTH DATA IN ACCORDANCE KITH ACI 501. CHEMICAL ADMIXTURES AND FLY ASH SHALL CONFORM TO <br />ASTM O4g4 AND G6Ia RESPECTIVELY. FLY ASH PERCENTAGE OF TOTAL CEMENTITIOUS MATERIAL SHALL NOT <br />EXCEED 20%. THE USE OF A PERFORMANCE MIX REQUIRES BATCH PLANT INSPECTION, THE COST OF WHICH <br />SHALL BE BROUGHT TO THE ATTENTION OF THE ONNER. REVIEW OF MIX SUBMITTALS BY THE ENGINEER OF <br />RECORD INDICATES ONLY THAT INFORMATION PRESENTED CONFORMS GENERALLY TO CONTRACT <br />DOCUMENTS. CONTRACTOR MAINTAINS FULL RE5PON5IE3ILITY FOR SPECIFIED PERFORMANCE. <br />ALL OONGRETE KITH SURFACES EXPOSED TO STANDING NATER SHALL BE AIR ENTRAINED KITH AN AIR <br />ENTRAINING AGENT CONFORMING TO ASTM C26O. TOTAL AIR CONTENT FOR FRO5T-E515TANT CONCRETE <br />SHALL BE IN ACCORDANCE KITH AGI 51aa14 TABLE 1q.53J. <br />21. REINFORCING STEEL SHALL CONFORM TO ASTM A615 (INCLUDING SUPPLEMENT 51), GRADE 60, fy = 60,000 1?51, <br />GRADE 60 REINFORCING STEEL INDICATED ON DRANINGS TO BE NELDED SHALL CONFORM TO ASTM Al06. <br />REINFORCING STEEL COMPLYING KITH ASTM A615 (51) MAY BE NELDED ONLY IF MATERIAL PROPERTY <br />REPORTS INDICATING CONFORMANCE KITH MELDING PROCEDURES SPECIFIED IN AJA1.5. DIA ARE SUBMITTED. <br />22. REINFORCING STEEL SHALL BE DETAILED (INCLUDING HOOKS AND BENDS) IN ACCORDANCE KITH AGI <br />515 AND 51 b. LAP ALL REINFORCEMENTS IN ACCORDANCE N I TH "THE REINFORCING SPLICE AND <br />DEVELOPMENT LENGTH SCHEDULE." PROVIDE CORNER BARS AT ALL NALL AND FOOTING INTERSECTIONS. <br />NO BARS PARTIALLY EMBEDDED IN HARDENED CONCRETE SHALL BE FIELD BENT UNLE55 SPECIFICALLY 50 <br />DETAILED OR APPROVED BY THE STRUCTURAL, ENGINEER, NO REINFORCING BARS SHALL BE 11NETm5ET" INTO <br />THE CONCRETE. PROVIDE A 20' LONG REDAR GROUND (LIFER GROUND) PER ELECTRICIAN, <br />25. CONCRETE PROTECTION (COVER) FOR REINFORCING 5TEEL SHALL 13E AS FOLLONS: <br />FOOTINGS AND OTHER UNFORMED SURFACES CAST AGAINST AND <br />PERMANENTLY EXPOSED TO EARTH . . . . . . . . . . . . . . . . . . . . . . . ............ . . . . . . . . . 511 <br />. <br />FORMED J,SURFACES EXPOSED TO EARTH (i.e. NALLS BELON GROUND) OR <br />HEATHER ............... 211 <br />...................................................... <br />COLUMN TIES OR 5PIRAL5 AND BEAM STIRRUPS . .. .......... .. .. .. .... . I-I/211 <br />5LAE35 AND HALLS (INTERIOR FACE) ...................... .. .. .. ..... 111 <br />24. CONCRETE NALL REINFORCING -PROVIDE THE FOLL®PING UNLE55 DETAILED OTHERNISE: <br />NALL THICKNE55 VERTICAL BARS HORIZONTAL BARS <br />- FUNWHIMMUN <br />LLJ <br />Lij <br />uj <br />W <br />® <br />LO <br />W <br />e <br />U <br />Drawing: <br />