My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1502 WALL ST 2019 IMAGINE CHILDRENS MUSEUM Plans 2022-11-09 (2)
>
Address Records
>
WALL ST
>
1502
>
IMAGINE CHILDRENS MUSEUM
>
Plans
>
1502 WALL ST 2019 IMAGINE CHILDRENS MUSEUM Plans 2022-11-09 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 1:51:55 PM
Creation date
8/16/2022 4:12:06 PM
Metadata
Fields
Template:
Address Document
Street Name
WALL ST
Street Number
1502
Tenant Name
IMAGINE CHILDRENS MUSEUM
Permit
B1906-009
Year
2019
Notes
3 STORY ADDITION TO EXISTING BLDG / WILL HOUSE EXHIBIT SPACE /
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A CEI_.# 00645- <br />SOON COLB, <br />3006 COLB" <br />EVERETT, WA, <br />M <br />-® 6" SANITARY <br />N PER COE <br />302 <br />I <br />SCALE <br />FEET <br />GENERAL NOTES—- <br />1. WATER SERVICE TO BE PROVIDED VIA SERVICE TO EXISTING <br />CHILDREN'S MUSEUM BUILDING. <br />DEPARTMENTB. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY <br />THE PUBLIC WORKS P R'S EXPENSE <br />WORKSTHE PUBLIC DEPARTMENT AT - <br />CONNECTIONBUSINESS DAYS NOTICE FOR EACH CONNECTION. THE PUBLIC WORKS <br />DEPARTMENT SHALL THEREAFTER DETERMINE THE DATE AND TIME AT <br />WHICH THE i <br />C. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT <br />STANDARDS. <br />E. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL <br />NOTIFY THE PUBLIC WORKS DEPARTMENT OF A PERSON WHO CAN <br />BE CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON A <br />24 HOUR BASIS. <br />F. MAINTAIN x HORIZONTAL AND 18 INCHES <br />MINIMUM OF 10 FEET <br />k SEPARATION BETWEEN PO -.:LE AND NON—POTA <br />CONVEYANCE SYSTEMS. <br />G. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY PUBLIC <br />WORKS DEPARTMENT PERSONNEL ONLY. ALL VALVES, NEW AND <br />EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES. <br />B. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY <br />THE PUBLIC WORKS DEPARTMENT AT THE DEVELOPER'S EXPENSE. <br />THE PUBLIC WORKS DEPARTMENT SHALL BE GIVEN AT LEAST 5 <br />BUSINESS DAYS NOTICE FOR EACH CONNECTION. THE PUBLIC WORKS <br />DEPARTMENT SHALL THEREAFTER DETERMINE THE DATE AND TIME AT <br />WHICH THE CONNECTION SHALL BE MADE. <br />C. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT <br />STANDARDS. <br />A PRE— CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY <br />PRIOR TO THE START OF CONSTRUCTION. THE CITY OF EVERETT <br />PUBLIC WORKS CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST <br />24 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION. <br />E. THEDEVELOPER AGENT SHALL <br />NOTIFY THE PUBLIC WORKS DEPARTMENT OF A PERSON WHO CAN <br />BE CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON A <br />24 ■ 5 BASIS. <br />F. MAINTAIN A MINIMUM OF 1 AND 18- <br />VERTICAL .ateATION BETWEEN -ABLE AND NON —POTABLE <br />CONVEYANCE SYSTEMS. <br />G. ALL CITY OF EVERETT VALVES SHALL BE OPERATEDPUBLIC <br />DEPARTMENTWORKS PERSONNELONLY. <br />EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES. <br />` s e o'. <br />Call <br />� <br />d <br />M <br />cn <br />O <br />tm <br />C <br />0 <br />C) <br />I— <br />0- <br />m <br />w <br />0LL <br />a� <br />I <br />s <br />o : a <br />0 1� <br />U) <br />w <br />U) <br />® L_ <br />i>> <br />Lr) 7 <br />w <br />0 <br />0 <br />U <br />Job Number: <br />17c-3907 <br />
The URL can be used to link to this page
Your browser does not support the video tag.