Laserfiche WebLink
PERTEET <br /> Schedule of 2022 Billing Rates <br /> Page 2 <br /> Direct Expenses Rate <br /> Living&travel expenses outside of service area Cost plus 10 percent <br /> Authorized Subconsultants Cost plus 10 percent <br /> Outside Services(printing,traffic counts,etc.) Cost plus 10 percent <br /> CADD Station $10.00 per hour <br /> Project Controls/Primavera $10.00 per hour <br /> GIS/Traffic Modeling $15.00 per hour <br /> Color Copies $.80 each <br /> Mileage @ current federal rate <br /> Construction Classifications 2022 Hourly Rate <br /> Construction Supervisor 230.00 <br /> Construction Engineering Manager 200.00 <br /> Senior Construction Manager 160.00 <br /> Construction Manager 130.00 <br /> Assistant Construction Manager 130.00 <br /> Construction Engineer III 145.00 <br /> Construction Engineer II 125.00 <br /> Construction Engineer I 115.00 <br /> Senior Electrical Construction Observer 185.00 <br /> Senior Construction Observer 160.00 <br /> Construction Observer III 135.00 <br /> Construction Observer II 95.00 <br /> Construction Observer I 85.00 <br /> Senior Office Engineer 145.00 <br /> Senior Construction Technician 130.00 <br /> Construction Technician III 120.00 <br /> Construction Technician II 100.00 <br /> Construction Technician I 90.00 <br /> Perteet's Hourly Rotes are subject to change each year on January h'. <br />