Laserfiche WebLink
Project:Emma Yule Park <br /> Change Order No. I <br /> Change Order Effective Date:2022-08-10 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax,the amount of the change order for the changes <br /> described in Exhibit A,represents complete compensation for the changes described in Exhibit A, <br /> including all direct and indirect costs and impacts.The contract price shall be adjusted as described in <br /> this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the Mayor or his <br /> designee is authorized to direct Contractor to perform additional work.In calculating such threshold <br /> amounts,Washington State sales tax,if applicable to the Work,has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change Order. <br /> 5. Contractor waives and releases any and all claims arising out of,or related to,this Change Order,the <br /> work described in Exhibit A,and all work and actual or constructive changes that occurred or began prior <br /> to the date of this Change Order,including,but not limited to,claims for equitable adjustment of time <br /> and compensation,delay,impact,overhead,or inefficiencies. This provision does not apply to requests <br /> for equitable adjustment of time or price for which the Contractor timely and properly provided notice of <br /> a differing site condition,protest,dispute,claim or Contract Claim as required by the Contract <br /> Documents. If the Contract Documents establish a time period for notice of a differing site condition, <br /> protest,dispute,claim,or Contract Claim that ends after the date of this Change Order,but relates to <br /> work performed prior to the date of this Change Order,then this provision does not apply if the <br /> Contractor timely and properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the extent explicitly <br /> provided herein. <br /> CITY <br /> Attest: Approved as to Form: <br /> gm APPROVED AS TO FORM <br /> OFFICE OF THE CITY ATTORNEY <br /> EVERETT <br /> Mayor City Cler l City Attorrey <br /> Date: 7iZ Date: 5/ Date: � ) <br /> Recommended By: <br /> Construction Manager Project Engineer(if Engineering Manager(if Department Director <br /> (if applicable) applicable) applicable) <br /> Mark Harrison, Parks Ruben Sanchez, Project Bob Leonard,Director of Parks <br /> Planning and Capiql Mgr,Parks and Facilities and Community Services <br /> Development 4ger <br /> COM/6- flr- Nh4 <br /> Date: Date: Date: 81 I/2.021- Date: j <br /> Emma Yule Park Change Order No. 1 Page 2 of 5 <br /> S:\kCommon\PrajPlan\PROJECT FILES\EMMA YUIE\2021_EIO NO 2\Consthigmt\ChangeOrders\Change Otder 1\2022 08-10 Emm,Yule Perk_Change Order 1..dotx <br />