My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Action Target 8/17/2022
>
Contracts
>
Capital Contract
>
Action Target 8/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 1:42:37 PM
Creation date
8/19/2022 1:33:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Action Target
Approval Date
8/17/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Josh O'Neill
Subject / Project Title
Police Firing Range Bullet Trap Replacement
Tracking Number
0003457
Total Compensation
$477,516.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 18 <br /> ARTICLE 10. NOTICE TO OWNER,timely submitted a Contract Claim pursuant to ARTICLE 12. <br /> CONTRACT CLAIMS and fulfilled the requirements of 5.2.2.Construction Schedule. <br /> 5.2.3. Construction Progress <br /> The Contractor shall furnish all labor,materials,facilities and Equipment necessary to insure the <br /> prosecution and completion of the Project within the interim milestones, Substantial Completion,Physical <br /> Completion and Completion Dates of the Contract. If Work falls seven(7)days or more behind the <br /> reviewed Preliminary Schedule,the Contractor agrees that, at its sole cost and expense,it will take all <br /> actions necessary to return the Project to the accepted schedule. These actions may include the following: I <br /> 1. Increase labor in quantities and crafts. <br /> 2. Increase the number of working hours per shift, shifts per working day,working days per week, <br /> or the amount of Equipment, or any combination of the foregoing. <br /> 3. Reschedule activities. <br /> If requested by the Owner's Representative,the Contractor shall prepare a proposed schedule revision <br /> demonstrating a plan to make up the lag in progress and insure completion of the Work within the <br /> Contract Time. All actions taken to return the Project to the accepted schedule are at the Contractor's <br /> expense. <br /> The Contractor shall pay all costs incurred by the Owner that result from the Contractor's action to return <br /> the Project to its accepted schedule,including,but not limited to,additional,overtime,or third party <br /> inspection,design and construction management service costs. Contractor agrees that Owner shall deduct <br /> such charges from payments due the Contractor. It is further understood and agreed that none of the <br /> services performed by the Owner's Representative in monitoring,reviewing and reporting Project status <br /> and progress shall relieve the Contractor of responsibility for planning and managing construction Work <br /> in conformance with the construction schedule. <br /> 5.2.4. Delays <br /> 5.2.4.1 General <br /> In the event of a Delay,the Contractor shall take immediate steps to minimize the Delay or avoid further <br /> Delay. The Contractor agrees it shall not make any Contract Claim or request for adjustment of Contract <br /> Time or Contract Sum based upon Delays for which it did not timely provide Notice to the Owner. <br /> 5.2.4.2 Bonuses <br /> If the Contract Documents provide the Contractor with a bonus or other incentive for early completion of <br /> a milestone or other completion point,Contractor assumes the risk of Delays caused wholly or partially <br /> by third parties. Owner shall not pay any bonus that Contractor would have achieved but for any and all <br /> Delays caused in whole or in part by a third party.By way of example only,the Contractor bears the risk <br /> of utility companies' failure to locate underground utilities accurately and the Contractor bears the risk of <br /> timely asking for the marking of the location of underground utilities. <br /> 5.3. SUSPENSION PROCEDURES <br /> The Owner may,at its convenience and at any time and without cause,suspend all or any part of the I <br /> Work by notice in writing to the Contractor. The Work shall be resumed by the Contractor within five(5) <br /> days after receiving written notice from the Owner to do so. The Contractor will be allowed an increase <br /> in the Contract Sum or an extension of Contract Time,or both,directly attributable to any suspension in ' <br /> accordance with the Change Order procedures herein;provided, (1)the Contractor shall not be entitled to <br /> any increase to the extent caused by the Contractor and(2)Contract Sum increases and Contract Time <br /> extensions for suspension caused by Third Parties or Force Majeure Events are limited as set forth in <br /> 12.4.3.4 Third Party Caused Delays and Force Majeure. <br /> 00 72 00 - 18 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.