Laserfiche WebLink
City of Everett 00 72 00 - 36 <br /> a. Unit prices,if the Work items are defined by unit prices;and <br /> b. Other prices agreed upon by the Contractor and Owner for Work not defined by unit prices. , <br /> 2. If the parties cannot agree,the Owner's Representative will determine the price pursuant to the <br /> following order: <br /> a. Unit prices,if the Work items are defined by unit prices;and <br /> b. Other means to establish the reasonable cost of the Work if it is not defined by unit prices, <br /> including,but not limited to, Force Account as described in 9.6.FORCE ACCOUNT,.the <br /> Schedule of Values,or estimating manuals. <br /> 9.5.2 Limitations <br /> The following limitations shall apply in determining the amount of an adjustment: I <br /> 1. Except as otherwise expressly provided,Contractor will only be paid for costs it clearly and <br /> convincingly proves it actually and directly incurred,and shall not include consequential or indirect <br /> damages not otherwise expressly permitted by the Contract Documents. Costs and damages for <br /> which Owner shall not be liable under any circumstances include,but are not limited to: (a) <br /> borrowing or interest costs,charges,or expenses of Contractor;(b)alleged lost profit or Overhead <br /> on any other project;and(c)Contractor's failure or inability to obtain other work. ' <br /> 2. No Contract Claim for adjustment of Contract Sum or additional compensation for extra,affected, <br /> impacted or inefficient Work will be allowed where the Contractor does not keep and maintain <br /> contemporaneous,complete and accurate time records for labor and equipment and contemporaneous,complete and accurate records for materials and where such records do not <br /> contemporaneously segregate and allocate by time,location and work the time and costs for each <br /> item or element of such work.Contractor's failure to keep and maintain such records constitutes a <br /> waiver of any Contract Claim or request by the Contractor for adjustment of Contract Sum for such <br /> costs or event. <br /> 3. To the extent the Contractor is entitled to an adjustment of Contract Sum due to any Delay or <br /> extension of Contract Time,Contractor shall be compensated as provided in 12.4 REMEDIES. <br /> Such compensation shall be full,adequate and complete compensation for all direct,indirect, <br /> cumulative,inefficiency,impact and ripple costs causing,arising out of,or relating to such delays <br /> or extension. <br /> 4. Contractor and Owner agree that compensation to the Contractor for a Contract Claim shall not <br /> exceed the Contractor's actual costs based upon Force Account as described in 9.6.FORCE <br /> ACCOUNT. Contractor waives,releases,and agrees not to submit any request for adjustment of <br /> Contract Sum or Contract Claim based upon a"total cost"or"modified total cost"calculation,in <br /> whole or in part,but instead agrees that any and all requests for compensation shall be based upon <br /> accurate,complete and contemporaneous cost records that segregate and allocate actual costs(a) <br /> between base Contract Work and the work for which additional compensation is sought and(b) <br /> between each item of work for which additional compensation is sought. Claims for inefficiency <br /> shall only be based on and calculated by a comparison of productivity of similar Work performed in <br /> an unaffected or least affected area of the Project. <br /> 5. No claim for consequential damages of any kind will be allowed. <br /> 9.5.3 Unabsorbed and Extended Overhead <br /> Any Extended or Unabsorbed Overhead to which the Contractor may be entitled shall be calculated using <br /> the Eichleay formula by: <br /> 1. Determining the pro-rata amount of Overhead allocable to the subject project. This is <br /> accomplished by multiplying Overhead costs by the ratio of the subject project's billings to the <br /> Contractor's overall billings during the overall period of the subject Project's performance.The <br /> result is"Allocable Overhead." <br /> 00 72 00 - 36 GENERAL CONDITIONS <br />