My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Action Target 8/17/2022
>
Contracts
>
Capital Contract
>
Action Target 8/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 1:42:37 PM
Creation date
8/19/2022 1:33:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Action Target
Approval Date
8/17/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Josh O'Neill
Subject / Project Title
Police Firing Range Bullet Trap Replacement
Tracking Number
0003457
Total Compensation
$477,516.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 47 <br /> I <br /> disasters,acts of war or acts of terrorism. Pandemic in the preceding sentence includes without <br /> limitation the COVID-19/novel coronavirus(SARS-CoV-2)pandemic,which is the subject of the <br /> Governor's proclamation dated February 29,2020,and subsequent proclamations. <br /> For the purposes of this section 12.4.3.4,a"Third Party"is defined as a third party for whom neither <br /> the Contractor nor the City is responsible. <br /> 12.4.3.4.1 Adjustment of Contract Sum <br /> The Owner and the Contractor shall not be responsible to compensate each other financially for <br /> any Delay to the extent caused by a Third Party or a Force Majeure Event. A Delay caused by a <br /> utility's failure to provide service or relocate its lines(despite a timely request for such service or <br /> relocation)is an example of this kind of Delay for which neither the Contractor nor the Owner is <br /> financially responsible to the other. Mislocated utility lines or utility lines not located are another <br /> example of a Delay for which neither the Contractor nor the Owner is responsible to the other. <br /> However,the Contractor's failure to request a utility locate or relocation in a timely way is not, <br /> and any resulting Delay would be the responsibility of the Contractor. Because the Contractor is <br /> responsible for ordering materials and Equipment,Contractor shall not be entitled to an <br /> adjustment of Contract Time or Contract Sum due to Delays caused by the lack of materials or <br /> Equipment. A strike,job action, slowdown,work to rule,or other job action or labor dispute or <br /> problem is not a Delay caused by a Third Party for the purposes of section 12.4.3 Delays. <br /> 12.4.3.4.2 Adjustment of Contract Time <br /> The Contractor shall be entitled to an extension of Contract Time for Delays to the extent caused <br /> by a Third Party or Force Majeure Event. Extension of Contract Time shall be determined <br /> pursuant to 5.2.2.2 Extensions of Contract Time. <br /> 12.4.3.5 Extended or Unabsorbed Overhead <br /> 12.4.3.5.1 General <br /> To present a request for additional compensation for Extended or Unabsorbed Overhead,the <br /> Contractor has the burden of keeping and maintaining accurate documentation to support any such <br /> claim. If the Contractor fails to provide or keep adequate financial data for an accurate and fair <br /> 1 Eichleay calculation, Contractor waives and releases any claim for Unabsorbed or Extended. <br /> Overhead. In presenting any claim under this section of the Contract,the Contractor agrees to provide <br /> to the Owner any and all fmancial data needed by the Owner,or its representative,to review, <br /> substantiate and evaluate any claim for Extended and/or Unabsorbed Home Office Overhead. Failure <br /> to provide the requested information shall constitute waiver by the Contractor. <br /> If Contractor is entitled to an adjustment of Contract Sum for Unabsorbed or Extended Overhead,it <br /> shall be calculated as provided in 9.5.3.Unabsorbed and Extended Overhead. <br /> 12.4.3.5.2 Elements <br /> Contractor shall only be entitled to an adjustment of Contract Sum for Unabsorbed or Extended <br /> Overhead if it clearly and convincingly demonstrates all of the following: <br /> 1. The Owner solely caused a delay to the Completion Date as measured by analysis of the project <br /> duration by the critical path method pursuant to 5.2.2.2 Extensions of Contract Time; <br /> 2. Because of such Delay,the Contractor was forced to suspend or significantly interrupt its <br /> performance so that it was on standby or idled,and the Owner required the Contractor to be ready <br /> to resume performance on short notice. Extended time of performance of Work,such as <br /> extensions caused by changes,inefficiencies,or Extra Work,does not constitute suspension or <br /> significant interruption of performance. <br /> 3. The Contractor could not and did not use resources,including but not limited to labor,materials <br /> ' and equipment, standing by or idled on this or any other project for any work during the period of <br /> delay; <br /> 00 72 00 - 47 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.