My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Action Target 8/17/2022
>
Contracts
>
Capital Contract
>
Action Target 8/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 1:42:37 PM
Creation date
8/19/2022 1:33:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Action Target
Approval Date
8/17/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Josh O'Neill
Subject / Project Title
Police Firing Range Bullet Trap Replacement
Tracking Number
0003457
Total Compensation
$477,516.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 01 35 53 - 1 <br /> Police Firing Range Bullet Trap Replacement <br /> SECTION 01 35 53 -SECURITY PROCEDURES <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: Procedures to maintain security including unauthorized entry, <br /> vandalism, and theft to buildings and grounds at Project site. <br /> B. Related Sections: <br /> 1. Section 01 31 19 - Project Meetings <br /> 2. Section 01 50 00 - Temporary Facilities and Controls <br /> 1.2 SECURITY PROGRAM <br /> A. Arrange with Owner, at Preconstruction Meeting specified Section 01 31 19, to set up <br /> security program to prevent unauthorized entry and to protect against other security <br /> problems, including loss due to theft, vandalism, and fire. <br /> B. Arrange with Owner for access keys as necessary to perform Work of this Contract. <br /> 1. Keys Issued by Owner: Do not duplicate. Return to Owner at Final Completion. <br /> 2. Keys not returned: Re-key locks at Contractor's expense and provide new keys <br /> conforming to keying types required by Owner. <br /> C. Establish adequate flood lighting to allow monitoring of Project site during evening <br /> hours. <br /> I <br /> 1.3 STORAGE AND PROTECTION <br /> A. Provide for secure lockup of stored materials and take additional measures to protect <br /> against theft vandalism, and other loss of property belonging to Owner located on site <br /> and at off-site facilities. <br /> 1.4 ENTRY CONTROL <br /> A. Restrict entrance of unauthorized persons and vehicles into construction areas. <br /> B. Maintain log with names and dates of those who enter site. <br /> C. Maintain security of construction fencing and gates as approved by Owner in advance. <br /> Lock at end of each working day. <br /> D. Maintain security site lighting systems as approved by Owner in advance. <br /> 01 35 53 - 1 SECURITY PROCEDURES <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.