My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Action Target 8/17/2022
>
Contracts
>
Capital Contract
>
Action Target 8/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 1:42:37 PM
Creation date
8/19/2022 1:33:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Action Target
Approval Date
8/17/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Josh O'Neill
Subject / Project Title
Police Firing Range Bullet Trap Replacement
Tracking Number
0003457
Total Compensation
$477,516.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 43 36 - 1 <br /> I <br /> Police Firing Range Bullet Trap Replacement <br /> ISECTION 00 43 36 - PROPOSED SUBCONTRACTORS FORM <br /> 1 . heating, ventilation and air conditioning, plumbing (as defined by RCW Chap. <br /> IFor <br /> 18.106) and electrical work (as defined by RCW Chap. 19.28), and structural <br /> steel installation and rebar installation, Bidder MUST either identify itself or <br /> Subcontractors in the chart below. If Bidder believes such work is not part of the <br /> IWork, Bidder shall write "NO WORK'. <br /> 2. Bidder shall not list more than one Subcontractor for each category of Work <br /> Iidentified, unless Subcontractors vary with Bid alternates, in which case the <br /> Bidder must indicate which Subcontractor will be used for which alternate. <br /> I3. Bidder's Bid shall be deemed non-responsive and void if: <br /> A. For heating, ventilation and air conditioning, plumbing, electrical work, <br /> structural steel installation and rebar installation, Bidder fails: (1) to submit <br /> Ias part of the Bid the names of such Subcontractors; (2) to name itself to <br /> perform such Work; or (3) to write "No Work"; or <br /> IB. Bidder names two or more Subcontractors to perform the same Work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation, air <br /> I conditioning, plumbing, electrical, structural steel installation and rebar <br /> installation subcontractors applies only to proposed heating, ventilation, air <br /> conditioning, plumbing, electrical, structural steel installation and rebar <br /> I installation subcontractors who will contract directly with the general contractor <br /> submitting the Bid to the City. <br /> I 5. The heating, ventilation and air conditioning, plumbing, and electrical portions of <br /> the chart below must be submitted with the bid proposal or within one hour of the <br /> published bid submittal time. <br /> I 6. The structural steel installation and rebar installation portions of the chart below <br /> must be submitted with the bid proposal or within forty-eight hours of the <br /> published bid submittal time. <br /> I <br /> I Type/Scope of Work Name and Address of Subcontractor or <br /> Bidder <br /> HEATING <br /> I Subcontractor, bidder or"no work' MUST be No War <br /> stated <br /> VENTILATION AND AIR CONDITIONING <br /> I Subcontractor, bidder or"no work" MUST be A6 Gs/Dr <br /> stated <br /> PLUMBING (as described in RCW Chap. <br /> 18.106) N'0 Wer.1: <br /> ISubcontractor, bidder or "no work" MUST be <br /> t l{c-fr(c ctu• -62 Ail v v 20 FL4 Load -D Da tt ( .t.e` ', Da. Sian <br /> I00 43 36 - 1 PROPOSED SUBCONTRACTORS FORM 12S-152-l76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.