Laserfiche WebLink
I <br /> City of Everett 00 52 13 - 1 <br /> IPolice Firing Range Bullet Trap Replacement <br /> ISECTION 00 52 13 -AGREEMENT FORM <br /> ICONTRACT <br /> THIS CONTRACT is made and entered into this t d <br /> . ay of --SU L`( ,a0 ,by <br /> I and between the City of Everett, Washington, a municipal corporation existing under the <br /> laws of the State of Washington (the "City") and <br /> ptC r o(,- -Tr) &�i , (the "Contractor"). <br /> I <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br /> I agrees to furnish all labor, tools, materials, equipment, and supplies required to build and <br /> construct and to build and construct in a workmanlike manner the work, improvements, <br /> and appurtenances in accordance with the Specifications and Drawings and all other <br /> I Contract Documents entitled: " fo Oa._ Fi P.%>-3U RPN6,C ", (the "Project"). <br /> 601.1,-CT -rQ ' P, ttAd <br /> 1. Contract Documents. The "Contract Documents" are defined in the General <br /> Conditions. The Contract Documents are part of this Contract and are hereby <br /> Iincorporated by reference. Terms that are capitalized in a Contract Document but not <br /> defined in that Contract Document shall have the meaning defined to them in the other <br /> Contract Documents. <br /> I2. Contract Time. Substantial Completion of the Work shall be achieved within One <br /> Hundred (100) calendar days after the effective date of the Notice to Proceed. Physical <br /> I Completion shall be within thirty (30) calendar days after the actual date of issuance of <br /> Substantial Completion. <br /> I 3. Liquidated Damages. The parties agree the City will suffer damage and be put <br /> to additional expense in the event that the Contractor does not complete the Work in all <br /> respects and have it ready for use by the Substantial and Physical Completion dates <br /> stated above. Because it is difficult to accurately compute the amount of such costs <br /> Iand damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br /> damages for each and every calendar day (or working day, if Contract Time is <br /> I described in working days) in the amounts set forth in this Section. For failure to <br /> achieve Substantial Completion by the Substantial Completion date stated above, the <br /> Contractor shall pay liquidated damages to the City computed at the daily rate of fifteen <br /> percent (15%) of the Contract Sum divided by the number of days of Contract Time <br /> Istated above. Once Substantial Completion is achieved, for failure to achieve Physical <br /> Completion by the Physical Completion Date stated above, the Contractor shall pay <br /> I liquidated damages at the daily rate of ten percent (10%) of the liquidated damages rate <br /> applicable to delays to Substantial Completion. <br /> I 4. Contract Sun. The amount of this Contract is <br /> `P 11477 S it,. v-o - ($ ) and is based QtYYtica." <br /> on the proposal/bid submitted by Contractor dated - 1 1-1 .,b The basis for final lr\cj\u <br /> 00 52 13 - 1 AGREEMENT FORM ii\ <br /> Suv5 <br />