My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Action Target 8/17/2022
>
Contracts
>
Capital Contract
>
Action Target 8/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 1:42:37 PM
Creation date
8/19/2022 1:33:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Action Target
Approval Date
8/17/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Josh O'Neill
Subject / Project Title
Police Firing Range Bullet Trap Replacement
Tracking Number
0003457
Total Compensation
$477,516.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 63 25 - 1 <br /> ' Police Firing Range Bullet Trap Replacement <br /> SECTION 00 63 25 -SUBSTITUTION REQUEST FORM <br /> PROJECT: Police Firing Range Bullet Trap Replacement <br /> REQUEST NO.: <br /> CONTRACTOR: DATE: <br /> We hereby submit for consideration, following product instead of specified item for <br /> above project: <br /> Section Specified Item <br /> Proposed Substitution <br /> Attach complete technical data, including laboratory tests, and samples, as applicable. <br /> ' Attach detailed comparison of the significant qualities (size, weight, durability, <br /> performance and similar characteristics, and including visual effect where applicable)for <br /> the proposed substitution in comparison with the original requirements. <br /> List complete installation changes and changes to Drawings and Specifications required <br /> by proposal. <br /> Fill in Blanks Below: <br /> A. Does substitution require change in Drawing dimensions? <br /> B. Will Undersigned pay for resulting building design changes including engineering <br /> and detailing costs? <br /> ' C. What effect does substitution have on other trades? <br /> D. Differences between proposed substitution and specified item? <br /> ' E. Manufacturer's guarantees of proposed and specified items are: <br /> Same Different (Explain on attachment) <br /> F. Name and address of three (3) similar projects on which product was used, and <br /> date of installation <br /> I <br /> ' G. Contract completion date is: Same Different (Explain on attachment). <br /> 00 63 25 - 1 SUBSTITUTION REQUEST FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.