My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Action Target 8/17/2022
>
Contracts
>
Capital Contract
>
Action Target 8/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 1:42:37 PM
Creation date
8/19/2022 1:33:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Action Target
Approval Date
8/17/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Josh O'Neill
Subject / Project Title
Police Firing Range Bullet Trap Replacement
Tracking Number
0003457
Total Compensation
$477,516.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 63 63 - 2 <br /> Police Firing Range Bullet Trap Replacement ' <br /> Change Order No. <br /> Change Order Effective Date: ' <br /> CONTRACT TIME <br /> Original Contract Time Working Days / Calendar Days <br /> Date of Notice to Proceed ' <br /> Cumulative adjustment to time by prior Change Orders <br /> Adjustment to time by this Change Order <br /> New Contract Time (including this Change Order) <br /> Contractor and City agree as follows: ' <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The amount of this Change Order for the changes described in Exhibit A, represents <br /> complete compensation for the changes described in Exhibit A, including all direct <br /> and indirect costs and impacts. The Contract Sum shall be adjusted as described in <br /> this Change Order. With respect to Washington State sales tax, the amount of this <br /> Change Order excludes such tax unless the box for"inclusive of Wash. State Sales <br /> Tax" is checked on the preceding page. , <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. <br /> In calculating such threshold amounts, Washington State sales tax, if applicable to <br /> the Work, has been considered. <br /> 4. The Contract Time of the Contract shall be adjusted to the extent described in this , <br /> Change Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or <br /> constructive changes that occurred or began prior to the date of this Change Order, <br /> including, but not limited to, claims for equitable adjustment of time and <br /> compensation, delay, impact, overhead, or inefficiencies. This provision does not <br /> apply to requests for equitable adjustment of time or price for which the Contractor <br /> timely and properly provided notice of a differing site condition, protest, dispute, <br /> claim or Contract Claim as required by the Contract Documents. If the Contract <br /> Documents establish a time period for notice of a differing site condition, protest, <br /> dispute, claim, or Contract Claim that ends after the date of this Change Order, but <br /> relates to work performed prior to the date of this Change Order, then this provision <br /> does not apply if the Contractor timely and properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. , <br /> 7. Signature(s) on this Change Order may be by pdf, email, fax or other electronic <br /> means, in which case such signature(s) will have the same effect as an original ink <br /> signature. This Change Order may be signed in counterparts, each of which shall be <br />
The URL can be used to link to this page
Your browser does not support the video tag.