Laserfiche WebLink
i <br /> City of Everett 00 72 00 - 2 <br /> i <br /> Sum,additional compensation that the Contractor attempts to pass through or assert against the Owner, or <br /> claims against the Owner arising out of a third party's claim against the Contractor. <br /> Contract Sum: The price in dollars stated in the Contract to be paid by the Owner to the Contractor for <br /> the Work described in the Contract Documents,as modified by any Change Orders. <br /> Contract Time: The duration of the Project as stated in the Contract and as modified by any Change <br /> Orders. <br /> Contractor: The individual or entity with whom Owner has entered into the Agreement. <br /> Day: Calendar Day,unless explicitly stated otherwise. <br /> Delay: Any increase of the duration of the critical path of the Project. <br /> Dispute: Any controversy or disagreement. <br /> Drawings: That part of the Contract Documents that graphically shows the scope,extent, and character of <br /> the Work to be performed by Contractor. Shop Drawings and other Contractor Submittals are not <br /> Drawings as so defined. <br /> Effective Date of Agreement: See 18.10 EFFECTIVE DATE. <br /> Engineer:An individual or entity retained by the Owner to be the Owner's representative regarding <br /> matters of design intent. The terms"Owner's Representative","Engineer"and"Architect"are <br /> interchangeable. <br /> Equipment: Mechanical,electrical,instrumentation,or other devices with one or more moving parts, or <br /> devices requiring an electrical,pneumatic,electronic,or hydraulic connection. <br /> Extended Overhead: The increase in Overhead costs attributable to an extension of Contract Time. <br /> Extra Work: Providing materials and Equipment and the performance of Work not directly called for in, I <br /> or implied by,the Contract Documents, such that Contractor would be entitled to an adjustment of <br /> Contract Sum and possibly an extension of Contract Time. <br /> Field Order: A written order issued by Owner's Representative that requires minor changes in the Work <br /> but does not involve a change in the Contract Sum or the Contract Time. <br /> Final Acceptance: Formal action by Everett City Council determining that all of the Contractor's Work <br /> has been completed,except for any landscaping maintenance. <br /> Float: The amount of time between the early start date and the late start date,or the early fmish date and <br /> the late finish date of any activity in the project schedule. <br /> Force Account: Costs of performing Work as defined in 9.6.FORCE ACCOUNT. <br /> Furnish,Install,Perform,Provide,Supply: The word"Furnish" or the word"Install"or the word <br /> "Perform" or the word"Provide"or the word"Supply,"or any combination or similar directive or usage <br /> thereof, shall mean furnishing and incorporating in the Work including all necessary labor,materials, <br /> equipment,and everything necessary to perform the Work indicated,unless specifically limited in the <br /> context used. I <br /> General Conditions: This Section 007200 of the Contract Documents. <br /> May: Conduct that is permitted,but not required. <br /> Milestone: A principal event specified in the Contract documents relating to an intermediate completion <br /> date or time prior to Substantial Completion of all the Work. <br /> Notice: A signed,written communication by the Contractor to the Owner as described in ARTICLE 10. <br /> NOTICE TO OWNER. <br /> Notice of Award: The written notice from the City of Everett to the successful Bidder signifying the <br /> City's acceptance of the Bid. No Contract is formed until the Effective Date. <br /> 00 72 00 - 2 GENERAL CONDITIONS <br />