I <br /> City of Everett 00 72 00 - 7 <br /> omission has been made,then he or she will determine the corrective actions and advise the Contractor <br /> ' accordingly. If the corrective work associated with an error or omission significantly increases or <br /> decreases the amount of Work called for in the Contract,the Owner will issue an appropriate Change <br /> Order. After discovery by the Contractor of an error or omission,related work performed by the <br /> ' Contractor shall be done at its risk unless authorized by the Owner's Representative and approved by the <br /> Owner. Omissions from the Drawings or Specifications or the misdescription of details of Work that are <br /> manifestly necessary to carry out the intent of the Drawings and Specifications,or that are customarily <br /> performed,shall not relieve the Contractor from performing such omitted or misdescribed details of the <br /> Work,but they shall be performed as if fully and correctly set forth and described in the Drawings and <br /> Specifications. <br /> 2.3.2. Conflicting Provisions <br /> Figure dimensions on drawings shall govern over scale dimensions and detail drawings shall govern over <br /> general drawings. In the event an item of Work is described differently in two or more locations on the <br /> Drawings and in the Specifications,the Contractor shall,upon request of the Owner's Representative, <br /> submit in writing to the Owner's Representative the description upon which the Contractor relied in <br /> preparing its Bid or laying out the Work. If the Owner's Representative directs the Contractor to perform <br /> Work in a manner other than that contemplated by the Contractor in preparing its Bid or laying out the <br /> Work,Change Order procedures will be followed. In this event,the Contractor shall submit to the <br /> Owner's Representative such supporting information,including bidding or layout documents,as may <br /> reasonably be necessary for the Owner's Representative to determine whether the Contract Sum is <br /> ' increased,decreased or unchanged by the Change Order. <br /> 2.3.3. Utilities <br /> 2.3.3.1 General <br /> The Owner has endeavored to determine the existence of utilities at the Site of the Work from the records <br /> of the owners of known utilities in the vicinity of the Work. The positions of these utilities as derived <br /> from such records are shown on the Drawings. No excavations were made to verify the locations shown <br /> for underground utilities. The service connections to these utilities are not shown on the Drawings. It <br /> shall be the responsibility of the Contractor to determine the exact location of utilities and service <br /> connections thereto. Such field verification must be performed in sufficient time so as not to impede the <br /> progress of the Work or fabrication of materials to be incorporated into the Work. The Contractor shall <br /> call the Utility Location Request Center(one call center)for location of utilities in the field not less than <br /> two(2)nor more than(10)ten business days before the scheduled date of commencement of excavation. <br /> The Contractor shall make its own investigations,including exploratory excavations, to determine the <br /> locations and type of existing utilities,including service connections,prior to commencing work that <br /> could result in damage to such utilities. The Contractor shall immediately notify the Owner's <br /> Representative as to any utility discovered by him in a different position than shown on the Drawings or <br /> which is not shown on the Drawings. No excavation shall begin until all known facilities in the <br /> excavation areas have been marked. Contractor shall coordinate its activities with the utility provider. <br /> Contractor shall bear the cost of maintaining utility service. <br /> The Contractor should be aware of, and comply with,Chapter 19.122 RCW,a law relating to <br /> underground utilities. The Owner shall not pay Contractor any of Contractor's cost of complying with <br /> this law,or repairing or indemnifying any damage or injury arising out of Contractor's failure to comply <br /> ' with this law. <br /> Owner does not represent or warrant who may be obligated to pay for the cost of relocation or temporary <br /> maintenance of the utility. Contractor shall investigate whether such cost must be borne by the owner of <br /> ' the utility. <br /> Governmental agencies and owners of utilities reserve the right to enter upon streets,alleys, rights-of- <br /> way, or easements for the purpose of making changes in their property made necessary by the Work and <br /> for the purpose of maintaining and making repairs to their property. <br /> 00 72 00 - 7 GENERAL CONDITIONS <br />