My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Action Target 8/17/2022
>
Contracts
>
Capital Contract
>
Action Target 8/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 1:42:37 PM
Creation date
8/19/2022 1:33:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Action Target
Approval Date
8/17/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Josh O'Neill
Subject / Project Title
Police Firing Range Bullet Trap Replacement
Tracking Number
0003457
Total Compensation
$477,516.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 10 <br /> 1 <br /> provide the assistance necessary for obtaining such access,and shall provide information related to the <br /> inspection of construction. Absence of such access or information,as needed,may result in the Owner's <br /> refusal to accept the Work. <br /> The Owner's Representative has the authority to recommend Change Orders,but does not have authority <br /> to approve Change Orders. Proposed Change Orders are subject to review and approval by the Owner. <br /> No proposed Change Order or any change of Contract Sum or Contract Time is effective or binding upon <br /> the Owner unless and until the Mayor or his or her designee signs it,as authorized by City Council or by <br /> ordinance. <br /> To detail and illustrate the Work,the Owner's Representative may furnish to the Contractor additional <br /> Drawings and explanations consistent with the original Drawings. The Contractor shall perform the Work <br /> according to these additional Drawings and explanations. <br /> The Owner's Representative may appoint assistants and inspectors to assist in determining that the Work <br /> and materials meet the Contract requirements.Assistants and inspectors have the authority to reject <br /> defective material and suspend Work that is being done improperly,subject to the final decisions of the <br /> Owner's Representative or,when appropriate,the Owner. <br /> Assistants and inspectors are not authorized to accept work,to accept materials,to issue instructions,or to <br /> give advice that is contrary to the Contract.Work done or material furnished which does not meet the <br /> Contract requirements shall be at the Contractor's risk and shall not be a basis for a Contract Claim even <br /> if the Owner's Representative, inspectors or assistants purport to change the Contract. <br /> Assistants and inspectors may advise the Contractor of faulty Work or materials or infringements of the <br /> terms of the Contract;however,failure of the Owner's Representative or the assistants or inspectors to <br /> advise the Contractor does not constitute acceptance or approval. <br /> The Contractor shall submit supplemental working or detail drawings as required for the performance of <br /> the Work pursuant to 2.4.SUBMITTALS.Except as noted,all drawings and other Submittals shall be <br /> delivered directly to the Owner's Representative.The drawings shall be on sheets measuring 22 by 34 <br /> inches, 11 by 17 inches,on sheets with dimensions in multiples of 8 1 /2 by 11 inches,or other size <br /> approved by the Owner consistent with the Work to be detailed. Contractor shall provide drawings far <br /> enough in advance of ordering or installation to allow for review by the Owner's Representative or other <br /> agencies and possible resubmittal and further review after resubmittal. After a plan or drawing has been <br /> reviewed and returned to the Contractor,all changes proposed by the Contractor may be submitted to the <br /> Owner's Representative for review and comment. <br /> The Contractor shall obtain the Owner's Representative's written acknowledgement of approved <br /> Submittals before proceeding with the Work represented by the Submittal. Such review does not impose <br /> any responsibility upon the Owner,nor does it relieve the Contractor of any responsibility for the <br /> accuracy of the Submittal or its conformity with the Contract. The Contractor shall bear all risk and all <br /> costs of any Work delays caused by resubmittal or correction of Submittals. The Contractor shall allow <br /> sufficient time for Owner's review of Submittals and possible corrections by the Contractor so as not to <br /> delay the Work. <br /> The Contractor's Bid price shall include all costs of all Submittals,including,but not limited to,working, I <br /> detail and shop drawings. <br /> 4. CONTRACTOR I <br /> 4.1. CONTRACTOR'S REPRESENTATIVE <br /> The Contractor shall notify the Owner in writing of the name of the person who will act as the ' <br /> Contractor's representative and shall have the authority to act in matters relating to this Contract. This <br /> person shall have authority to carry out the provisions of the Contract and to supply materials,Equipment, <br /> tools and labor without delay for the performance of the Work. 1 <br /> 00 72 00 - 10 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.