Laserfiche WebLink
I <br /> i <br /> WWHM2012 <br /> PROJECT REPORT <br /> Project Name: R-Tank w mini <br /> Site Name: SONRISE CHRISTIAN <br /> Site Address: XXXX AIRPORT ROAD <br /> City : EVERETT <br /> ' Report Date: 5/30/2018 <br /> Gage : Everett <br /> Data Start : 1948/10/01 <br /> Data End : 2009/09/30 <br /> I/ Precip Scale: 1.00 <br /> Version Date: 2017/07/05 <br /> Version : 4.2.13 <br /> Low Flow Threshold for POC 1 : 50 Percent of the 2 Year <br /> High Flow Threshold for POC 1: 50 year <br /> PREDEVELOPED LAND USE <br /> Name : EXISTING BASIN <br /> Bypass: No <br /> GroundWater: No <br /> Pervious Land Use acre <br /> C, Forest, Mod 1.11 <br /> Pervious Total 1.11 <br /> Impervious Land Use acre <br /> Impervious Total 0 <br /> Basin Total 1.11 <br /> I <br /> Element Flows To: <br /> Surface Interflow Groundwater <br /> I <br /> MITIGATED LAND USE <br /> Name : DEVELOPED <br /> Bypass: No <br /> Insight Engineering Co. -Stormwater Site Plan 12/20/2018 <br /> -25 - <br /> 1 <br />