Laserfiche WebLink
I <br /> II 59 0.0129 0.0159 <br /> 60 0.0122 0.0150 <br /> 61 0.0041 0.0141 <br /> II <br /> Stream Protection Duration <br /> I POC #1 <br /> The Facility PASSED <br /> The Facility PASSED. <br /> I/ <br /> Flow(cfs) Predev Mit Percentage Pass/Fail <br /> 0.0124 20683 9794 47 Pass <br /> 11 0.0129 18373 7565 41 Pass <br /> 0.0135 16320 6231 38 Pass <br /> 0.0141 14440 5304 36 Pass <br /> 0.0147 12900 4620 35 Pass <br /> I 0.0153 11477 4047 35 Pass <br /> 0.0159 10243 3615 35 Pass <br /> 0.0164 9137 3302 36 Pass <br /> I 0.0170 8185 3031 37 Pass <br /> 0.0176 7274 2772 38 Pass <br /> 0.0182 6500 2582 39 Pass <br /> 0.0188 5837 2383 40 Pass <br /> II 0.0193 5257 2184 41 Pass <br /> 0.0199 4759 2040 42 Pass <br /> 0.0205 4303 1903 44 Pass <br /> 11 0.0211 3861 1760 45 Pass <br /> 0.0217 3461 1617 46 Pass <br /> 0.0222 3069 1525 49 Pass <br /> 0.0228 2714 1442 53 Pass <br /> I 0.0234 2449 1383 56 Pass <br /> 0.0240 2212 1324 59 Pass <br /> 0.0246 2012 1271 63 Pass <br /> 0.0251 1845 1222 66 Pass <br /> II 0.0257 1709 1178 68 Pass <br /> 0.0263 1571 1135 72 Pass <br /> 0.0269 1456 1093 75 Pass <br /> II 0.0275 1362 1045 76 Pass <br /> 0.0281 1291 987 76 Pass <br /> 0.0286 1212 934 77 Pass <br /> 0.0292 1145 884 77 Pass <br /> II 0.0298 1074 838 78 Pass <br /> 0.0304 999 795 79 Pass <br /> 0.0310 935 739 79 Pass <br /> I 0.0315 893 696 77 Pass <br /> 0.0321 849 662 77 Pass <br /> 0.0327 809 624 77 Pass <br /> 0.0333 761 585 76 Pass <br /> II 0.0339 720 552 76 Pass <br /> 0.0344 689 509 73 Pass <br /> 0.0350 664 478 71 Pass <br /> 0.0356 642 447 69 Pass <br /> I/ 0.0362 623 416 66 Pass <br /> 0.0368 603 389 64 Pass <br /> 0.0374 586 370 63 Pass <br /> IIInsight Engineering Co. -Stormwater Site Plan 12/20/2018 <br /> -32- <br /> I <br />