Laserfiche WebLink
I <br /> 11 <br /> Water Quality BMP Flow and Volume for POC #1 <br /> I/ <br /> On-line facility volume: 0 acre-feet <br /> On-line facility target flow: 0 cfs. <br /> Adjusted for 15 min 0 cfs. <br /> Off-line facility target flow: 0 cfs. <br /> Adjusted for 15 min: 0 cfs. <br /> LID Report <br /> LID Technique Used for Total Volume Volume Infiltration Cumulative <br /> Percent Water Quality Percent Comment <br /> Treatment? Needs Through Volume Volume <br /> Volume Water Quality <br /> Treatment Facility (ac-ft.) <br /> Infiltration Infiltrated Treated <br /> (ac-ft) (ac-ft) Credit <br /> Gravel Trench Bed 1 POC N 135.54 N <br /> 0.00 <br /> Total Volume Infiltrated 135.54 0.00 0.00 <br /> 0.00 0.00 0% No Treat. Credit <br /> Compliance with LID Standard 8 <br /> Duration Analysis Result = Failed <br /> I <br /> Perind and Impind Changes <br /> No changes have been made. <br /> This program and accompanying documentation are provided 'as-is' without warranty of any <br /> 11 kind. The entire risk regarding the performance and results of this program is assumed by <br /> End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees <br /> disclaim all warranties, either expressed or implied, including but not limited to implied <br /> warranties of program and accompanying documentation. In no event shall Clear Creek <br /> Solutions Inc. be liable for any damages whatsoever (including without limitation to <br /> damages for loss of business profits, loss of business information, business interruption, <br /> and the like) arising out of the use of, or inability to use this program even if Clear <br /> Creek Solutions Inc. or their authorized representatives have been advised of the <br /> possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005- <br /> 2018; All Rights Reserved. <br /> I <br /> I <br /> 1 <br /> I/ <br /> Insight Engineering Co. -Stormwater Site Plan 12/20/2018 <br /> -34- <br /> I <br />