My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11625 AIRPORT RD SONRISE CHRISTIAN CENTER 2022-08-25
>
Address Records
>
AIRPORT RD
>
11625
>
SONRISE CHRISTIAN CENTER
>
11625 AIRPORT RD SONRISE CHRISTIAN CENTER 2022-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 7:40:35 AM
Creation date
8/24/2022 4:42:09 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11625
Tenant Name
SONRISE CHRISTIAN CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> 2019 System Development Fee Calculations <br /> Permit#: PW1808-010 Additional Notes: <br /> Project Address: 11625 Airport Rd. <br /> Project Name: Sunrise Christian Center <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Benyam Stephanos Date: 3/18/2019 <br /> Outside City Limits? *Adds a 25%Surcharge 42012OI N1 A <br /> Supportive Housing Credit? *Reduces by 80% Reviewed By: Date: <br /> Fee Calculations: <br /> Water&Sewer System Development Fees: <br /> Domestic Meter: Fee Calculation(Before Credit): Credit Calculations(Up to 3 meters for Meter-Based Calculation or 3 previous building uses for Administrative Guidelines-Based Calculation): <br /> *Subject to Administrative Guidelines Proposed Building Use: Previous Bldg Use#1: - Previous Bldg Use#2: Previous Bldg Use#3: <br /> ProposedUnit Measure: #N/A Unit Measure for Use#1: #N/A Unit Measure for Use#2: #N/A Unit Measure for Use#3: PN/A <br /> #N/A Proposed Meter Size: Credited Meter#1 Size: Credited Meter#2 Size: Credited Meter#3 Size: <br /> Water Fee: #N/A Water Credit#1: #N/A Water Credit#2: #N/A Water Credit#3: #N/A. <br /> Sewer Fee: #N/A Sewer Credit#1: #N/A Sewer Credit#2: #N/A _ Sewer Credit#3: #N/A <br /> Total Fees Due:Add to Utility Permit for Domestic Meter <br /> Permit#:U Water Sys Dev Fee Total: #N/A This fee reflects credit for existing water meter <br /> Sewer Sys Dev Fee Total: #N/A This fee reflects credit for existing water meter <br /> Total: #N/A <br /> Irrigation Meter: Fee Calculation(Before Credit): Credit Calculations: <br /> Proposed Meter Size: 1 Credited Meter Size: <br /> Water Fee: #N/A Water Credit: #N/A <br /> No Sewer Fee: $0.00 No Sewer Credit: $0.00 <br /> Total Fees Due:Add to Utility Permit for Irrigation Meter <br /> Permit#:U Water Sys Dev Fee Total: #N/A This fee reflects credit for existing water meter <br /> No Sewer Sys Dev Fee:_ $0.00 Irrigation meters are only subject to the water portion of system development fees <br /> Total: #N/A <br /> Fire Meter: Proposed Meter Size: None For informational purposes only <br /> Permit#:U No Sys Dev Fees: $0.00 Fire meters are not subject to system development fees <br /> Stormwater System Development Fees: <br /> Permit#:_PW1808-010 Type of Construction:E.,e Delft(. /rtertf t\q N'14,) ta..rc . :lj(7 r�-CiC.s <br /> Square Feet of New Plus Replaced Hard Surfaces: 37,785 SF J 9/ <br /> Stormwater System Dev Fee: $9,397.13 Add this fee to the Building Permit(or Public Works Permit if there is no building permit for the project) <br /> j i <br />
The URL can be used to link to this page
Your browser does not support the video tag.