I <br /> SECTION VIII: PERMANENT STORMWATER CONTROL PLAN <br /> A. OFF-SITE ANALYSIS <br /> A site reconnaissance was performed by Brian Kalab of Insight Engineering on <br /> May 14, 2018 to verify the downstream flow paths and observe any drainage problems <br /> downstream of the site. The sky was clear and overcast with a temperature of 77 degrees. <br /> The site contains 1.88 Acres. The site is currently vacant with access from Sonrise <br /> Christian Center. The remainder of the site exists as lawn and native vegetation. The site <br /> contains one drainage basin that that slopes moderately to the south west. Please refer to <br /> the downstream analysis map for more details. Per NRCS survey of Snohomish County, the <br /> project site contains Alderwood soils that have a hydrologic classification of Type"C". <br /> Please refer to the soils map and descriptions attached later in this report for more details. <br /> Upstream Analysis <br /> Based on the site reconnaissance and the topographic survey of the site, the off-site <br /> area entering the site is very minimal. Refer to the Downstream Analysis Map attached in <br /> the next page for more details. <br /> Downstream Analysis <br /> Refer to the Downstream Analysis Maps 1 and 2 attached to the next pages for a <br /> visual description of the downstream flow. <br /> The runoff from the existing site flows to the south and joins the existing drainage <br /> system. The flow continues south east through a 12-in Concrete Pipe for about 240-ft and <br /> then continues west for 198 ft to enter a wetland. From the wetland it continues flowing <br /> Ithrough the existing drainage system for about 118 ft in south east direction and heads <br /> southwest and again southeast and finally crosses Pacific Hwy and finally discharges into <br /> Swamp creek. This is where the downstream analysis was concluded. <br /> I <br /> Insight Engineering Co. -Stormwater Site Plan 12/20/2018 <br /> - 17- <br /> i <br />