My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11625 AIRPORT RD SONRISE CHRISTIAN CENTER Geotech Report 2022-10-25
>
Address Records
>
AIRPORT RD
>
11625
>
SONRISE CHRISTIAN CENTER
>
Geotech Report
>
11625 AIRPORT RD SONRISE CHRISTIAN CENTER Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:09:09 PM
Creation date
8/25/2022 7:40:35 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11625
Tenant Name
SONRISE CHRISTIAN CENTER
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> GEOTECHNICAL EVALUATION <br /> EVERETT, WASHINGTON <br /> February 6, 2018 <br /> PORTLAND CEMENT CONCRETE(RIGID) PAVEMENT <br /> Min. PCC Depth Aggregate Base* Compacted Subgrade* <br /> ** <br /> 6.o in. 6.o in. 12.o in. <br /> *95%compaction based on ASTM Test Method D1557 <br /> **A proof roll may be performed in lieu of in place density tests <br /> The asphaltic concrete depth in the flexible pavement tables should be a surface course type asphalt,such <br /> as Washington Department of Transportation (WSDOT) 1/2 inch HMA. The rigid pavement design is <br /> based on a Portland Cement Concrete (PCC)mix that has a 28 day compressive strength of 4,00o pounds <br /> per square inch (psi). The design is also based on a concrete flexural strength or modulus of rupture of <br /> 55o psi. <br /> 9.0 Construction Field Reviews <br /> Cobalt Geosciences should be retained to provide part time field review during construction in order to <br /> verify that the soil conditions encountered are consistent with our design assumptions and that the intent <br /> of our recommendations is being met.This will require field and engineering review to: <br /> I . Monitor and test structural fill placement and soil compaction <br /> • Monitor temporary excavation stability <br /> ■ Observe proof rolls of roadway subgrade prior to asphalt placement <br /> Geotechnical design services should also be anticipated during the subsequent final design phase to <br /> support the structural design and address specific issues arising during this phase. Field and engineering <br /> review services will also be required during the construction phase in order to provide a Final Letter for <br /> the project. <br /> 10.o Closure <br /> This report was prepared for the exclusive use of Sonrise Christian Center and their appointed <br /> consultants.Any use of this report or the material contained herein by third parties,or for other than the <br /> ' intended purpose,should first be approved in writing by Cobalt Geosciences,LLC. <br /> The recommendations contained in this report are based on assumed continuity of soils with those of our <br /> test holes, and assumed structural loads. Cobalt Geosciences should be provided with final architectural <br /> and civil drawings when they become available in order that we may review our design recommendations <br /> and advise of any revisions,if necessary. <br /> Use of this report is subject to the Statement of General Conditions provided in Appendix A. It is the <br /> responsibility of Sonrise Christian Center who is identified as"the Client"within the Statement of General <br /> Conditions, and its agents to review the conditions and to notify Cobalt Geosciences should any of these <br /> not be satisfied. <br /> PO Box 82243 9 <br /> Kenmore,WA 98028 <br /> 331-1097 <br /> Cobol geo@gm <br /> Cobaltgeo(�gmail.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.