I <br /> I <br /> GEOTECHNICAL EVALUATION <br /> EVERETT,WASHINGTON <br /> IFebruary 6,2018 <br /> IThe excavated material is not suitable as fill material within parking lot but could be used as fill material <br /> in non-settlement sensitive areas such as landscaping regions.In these non-settlement sensitive areas,the <br /> I fill should be placed in maximum 12 inch thick lifts that should be compacted to at least 90 percent of the <br /> modified proctor(ASTM D 1557 Test Method)maximum dry density. <br /> The native soils below the vegetation and topsoil consist fine-grained glacial till. These soils are <br /> I considered suitable for use as structural fill provided they are within 3 percent of the optimum moisture <br /> content. The soils should be considered moisture sensitive and suitable for use as structural fill only <br /> during the summer months. <br /> I Imported structural fill should consist of a sand and gravel mixture with a maximum grain size of 3 inches <br /> and less than 5 percent fines(material passing the U.S. Standard No.200 Sieve). Structural fill should be <br /> placed in maximum lift thicknesses of 12 inches and should be compacted to a minimum of 95 percent of <br /> the modified proctor maximum dry density,as determined by the ASTM D 1557 test method. <br /> 8.1.2 Temporary Excavations <br /> 1 Based on our understanding of the project, we anticipate that the grading could include local cuts on the <br /> order of approximately 8 feet or less for detention vault placement. These excavations should be sloped <br /> no steeper than 1H:1V (Horizontal:Vertical) in medium dense to dense native soils and 3/4H:1V in very <br /> I dense native glacial till soils. If an excavation is subject to heavy vibration,extend below the groundwater, <br /> or surcharge loads, we recommend that the excavations be sloped no steeper than 1.5H:1V, where room <br /> permits. <br /> I Temporary cuts should be in accordance with the Washington Administrative Code (WAC) Part N, <br /> Excavation, Trenching, and Shoring. Temporary slopes should be visually inspected daily by a qualified <br /> person during construction activities and the inspections should be documented in daily reports. The <br /> I contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope <br /> erosion during construction. <br /> Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather,and the <br /> I slopes should be closely monitored until the permanent retaining systems or slope configurations are <br /> complete. Materials should not be stored or equipment operated within 10 feet of the top of any <br /> temporary cut slope. <br /> Soil conditions may not be completely known from the geotechnical investigation. In the case of <br /> temporary cuts, the existing soil conditions may not be completely revealed until the excavation work <br /> exposes the soil. Typically, as excavation work progresses the maximum inclination of temporary slopes <br /> Iwill need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be <br /> made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to be <br /> adjustable,to deal with unanticipated conditions, so that the project can proceed and required deadlines <br /> Ican be met. <br /> I <br /> 1 4 <br /> PO Box 82243 <br /> Kenmore,WA 98028 <br /> (206)331-1097 <br /> ICobaltgeo ftmail.com <br />