Laserfiche WebLink
Drew Martin <br />From: Drew Martin <br />Sent: Wednesday, January 13, 2021 8:45 AM <br />To: RB Engineers; Sanjeev Sharma; Sarmanjit Dhaliwal <br />Subject: RE: City of Everett Permit Services: 2712 Taylor Drive (B2006-012) - Third Building <br />Review <br />Good morning, Sir. <br />The steel notes can be retained if preferred —this was only a recommendation. They are confusing since the project <br />doesn't include any structural steel that would require them. Also, any structural steel requires special inspection, <br />which is not included in your list. This is ultimately at your discretion and responsibility to comply with the requirements <br />of the code. <br />Regarding the other issues, these are architectural -structural coordination issues, and must be resolved by the design <br />team. The City is not part of the design team, and it is therefore not our place to resolve design issues. Per the review <br />comments, the structural drawings contain information that conflicts with the architectural drawings, details that are <br />not consistent with the plans, and may require additional information to support the architectural design. Detailed <br />comments have been provided for these issues. Also, the structural drawings are incomplete with regard to the newly - <br />added Juliet balcony structural framing, as well as potentially needing modifications to coordinate with the architectural <br />design. These are design -coordination issues that the design team must resolve. <br />Please let me know if you have questions regarding the review comments or the code requirements. I would be happy <br />to clarify as needed. <br />_ Drew Martin, P.E., S.E. <br />Associate Engineer — Commercial Plans Examiner I Permit Services <br />425.257.8813 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br />EVERETT Hours: M/W/Th/F: 7:30am-12:OOpm & 1:OOpm-3:OOpm; Tu: 1:OOpm-3:OOpm <br />everettwa.gov I Facebook I Twitter <br />From: RB Engineers <rbe1992@gmail.com> <br />Sent: Tuesday, January 12, 20212:00 PM <br />To: Sanjeev Sharma <zrealtyplus@gmail.com>; Sarmanjit Dhaliwal <sarmanjits@gmail.com> <br />Cc: Drew Martin <dmartin@everettwa.gov> <br />Subject: Re: City of Everett Permit Services: 2712 Taylor Drive (B2006-012) - Third Building Review <br />Mr. Drew; <br />Please call me tomorrow before noon if possible. <br />We can omit the Steel notes on S3 if you want, but we'd like to leave them there, for misc steel usage on the project. <br />The other questions which are all stemming from architectural design must be clarified between you guys. <br />We are willing to help to some extend. <br />Thanks. <br />On Tue, Jan 12, 2021 at 10:11 AM Sanjeev Sharma <zrealtyplus@gmail.com> wrote: <br />Thanks Drew <br />Lets do it at 11 please. <br />1 /Z <br />