Laserfiche WebLink
• <br />• <br />On Tue, Jan 12, 2021 at 9:21 AM Drew Martin <dmartin@everettwa.gov> wrote: <br />Good morning, all. <br />I forgot to clarify that the design change for the west balconies to the Juliet balconies appears incomplete as follows: <br />• The framing is not clear. It appears that cantilever beams will protrude through the exterior wall and support <br />a long span PSL. One PSL dimension is missing. <br />• Clarify if the balcony will be recessed, or if not how water intrusion will be prevented. <br />• The cantilever ends will penetrate the exterior wall weather barrier; protection for the beam end and wall <br />penetration should be detailed. <br />• Clarify the sheathing for the balcony surface and if secondary joists or a rim joist are required. <br />• The PSL should be adequate to resist loads from the guard. Clarify which guard is intended and verify that <br />the base connection strength is adequate for top rail out -of -plane loading. <br />Drew Martin, P.E., S.E. <br />Associate Engineer —Commercial Plans Examiner I Permit Services <br />EVERETT <br />425.257.8813 13200 Cedar Street, 2"d Floor, Everett, WA 98201 <br />Hours: M/W/Th/F: 7:30am-12:OOpm & 1:OOpm-3:OOpm; Tu: 1:OOpm-3:OOpm <br />everettwa.gov I Facebook I Twitter <br />From: Sanjeev Sharma <zrealtyplus@gmail.com> <br />Sent: Monday, January 11, 2021 5:32 PM <br />To: Drew Martin <dmartin@everettwa.gov> <br />Cc: rbe1992@gmail.com <br />Subject: Re: City of Everett Permit Services: 2712 Taylor Drive (B2006-012) - Third Building Review <br />Received, thank you. <br />On Mon, Jan 11, 2021 at 5:24 PM Drew Martin <dmartin@everettwa.gov> wrote: <br />Good afternoon, Sanjeev. <br />