Laserfiche WebLink
Structural <br />1. Sheet S3 has been updated with the required information. It is noted that this sheet still contains steel <br />notes. Steel framing is understood to be eliminated from the project, and does not show up in the special <br />inspection schedule. Verify if the notes should be removed. <br />7. See Architectural Comment 7 above. The stairway construction, especially for the winder staircase, is not clear <br />and consistent in the drawings. The structural response and drawings appear to conflict with the architectural <br />response and drawings. <br />Drew Martin, P.E., S.E. <br />0 Associate Engineer —Commercial Plans Examiner I Permit Services <br />EVERETT <br />11 425.257.8813 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br />Hours: M/W/Th/F: 7:30am-12:OOpm & 1:OOpm-3:OOpm; Tu: 1:OOpm-3:OOpm <br />everettwa.gov I Facebook I Twitter <br />Sanjeev Sharma <br />Real Estate <br />Email: zrealtyplus@gmail.com <br />Secondary email: zcrhomes@gmail.com <br />(206) 853-9874 cell <br />(425) 836-4800 Home Office <br />Skyline Properties, Inc. <br />425-455-2065 Office <br />425-646-4766 Office Fax <br />50 116th Ave SE Suite 120 Bellevue, WA 98004 <br />This email and any files transmitted with it are confidential and intended solely for the use of the individual ore ntity to whom they are addressed. If you have received this <br />email in error please notify the sender. This message contains confidential information a ntended only for the individual named. If you are not the named addressee <br />CY?-) <br />