Laserfiche WebLink
[.I-. {1 A 7. 1111-.:..4.... �... r.. C�-a M'I�wr1c _ Onfir�l•�4i/�Il �l�S1T+i1111P(ti <br />Results Expected When Maintenance Is Per- <br />Maintenance Component <br />Defect <br />Conditions When Maintenance Is Needed <br />formed <br />(A percolation test pit or test of facility indicates facility is only working at 90% of its designed capabilities. Test every 2 to 5 years. If <br />two inches or more sediment is present, remove). <br />Filter Bags (if applicable) <br />Filled with Sediment and <br />Sediment and debris fill bag more than 1/2 full. <br />Filter bag is replaced or stem is redesigned. <br />Y <br />Debris <br />Rock Filters <br />Sediment and Debits <br />By visual inspection, little or no water flows through filter during heavy rain stones: <br />Gravel in rock filter 3 replaced. <br />See Table V-A.1: Maintenance Standards - Deter - <br />Side Slopes of Pond <br />Erosion <br />See Table V-A.1: Maintenance Standards - Detention Ponds . <br />tion Ponds <br />See Table V-A.1: Maintenance Standards - Deten- <br />Tree Growth <br />See Table V-A.1: Maintenance Standards - Detention Ponds <br />tion Ponds <br />Emergency Overflow Spillway, <br />and Berms over feet in heiglit.' <br />See Table V-A.1: Maintenance Standards - Deten- <br />See Table V-A.1: Maintenance Standards -Detention Ponds <br />Pion Ponds <br />tion <br />See Table V-A.1: Maintenance Standards - Deten- . <br />Rock Missing <br />See Table V-A.1: Maintenance Standards -Detention Ponds <br />tion Ponds <br />Emergency Overflow Spillway <br />See Table V-A.1: Maintenance Standards - Deter - <br />Erosion <br />See Table V-A.1: Maintenance Standards - Detention Ponds <br />tion Ponds <br />Facility or sump filled <br />Pre -settling Ponds and Vaults <br />with Sediment and/or <br />6" or designed sediment trap depth of sediment. <br />Sediment is removed. <br />debris <br />Table V-A.3: Maintenance Standards - Closed Detention Systems (Tanks/Vauits) <br />Maintenance <br />Defect <br />Conditions When Maintenance is Needed <br />Results Expected When Maintenance is Per - <br />formed <br />Component <br />Plugged Air Vents <br />One-half of the cross section of a vent is blocked at any point or the vent is damaged. <br />Vents open and functioning. <br />Accumulated sediment depth exceeds 10% of the diameter of the storage area for 1/2length of storage vault or any point <br />depth exceeds 15% of diameter. <br />Ail sediment and debris removed from storage <br />Debris and Sediment - <br />(Example: 72-in6h storage tank would require cleaning when sediment reaches depth of 7 inches for more than 1/2length of <br />area: <br />Storage Area <br />tank.) <br />Joints Between Tank/Pipe Section <br />Any openings or voids allowing material to be transported into facility. <br />Alljoint between tank/pipe sections are sealed. <br />III require engineering analysis to determine structural stability). <br />Tank Pipe Bent Out of Shape <br />Any pad of tank/pipe is bent out of shape more than 10"/o of its design shape. (Review required by engineer to determine <br />Tank/pipe repaired or replaced to design. <br />structural stability). <br />Cracks wider than 1/24nch and any evidence of soil particles entering the structure through the cracks, or main- <br />Vault replaced or repaired to design ape - <br />Vault Structure Includes Cracks in Wall, Bottom, <br />tenance/inspection personnel determines that the vault is not structurally sound. <br />cifications and is structurally sound. <br />Damage to Frame and/or Top Slab <br />Cracks wider than 1/24nch at thejoint of any inletloutlet pipe or any evidence of soil particles entering the vault through the <br />No cracks more than 1/4-inch wide at the joint of <br />walls. <br />the inlet/outlet pipe. <br />2019 Stormwater Management Manua/ for Western Washington <br />Volume V- Appendix A -.Page 1007 <br />