Laserfiche WebLink
11 Maintain BMPs <br />The construction'supervisor will be responsible for maintaining all BMPs during construction <br />and working with the City to relocate or add BMPs as necessary as site conditions change. <br />BMPs should be inspected and maintained. as needed after every rain event producing more <br />than %a . of.,rain.in a.24-ho.ur.;period. Also., BMPs shall be inspected on a weekly basis even <br />if site work is not occurring. <br />12:. Manage the Project <br />It will be the responsibility of the Contractor and Developer to manage this project and <br />coordinate with the -.City Inspector and Engineer. <br />Inspection and Monitoring: <br />Site inspections shall be done by a person who is knowledgeable in the principles and <br />practices of erosion and sediment control. The person must have skills to first assess the <br />site conditions and construction activities' that could impact the quality of stormwater, and <br />second assess the effectiveness of erosion and sediment control measures used to control <br />the quality of stormwater.discharges. Whenever inspection and/ormonitoring reveals that <br />the. B.M.Ps.identified.in the:.Construction.SWP.PP.;are.inadequate, dueto. the. actual discharge <br />of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design <br />changes shall be implemented as soon as `possible. . <br />Maintaining an Updated. Construction SWPPP: <br />The construction SWPPP shall be retained on -site or within reasonable access to the site. <br />The SWPPP shall be modified whenever there is a change in the design, construction, <br />operation, or maintenance at the, construction site that has, or could have, a significant effect <br />on the -discharge of pollutants to-watem-of4he-state. <br />The SWPPP shall be modified if, during inspections or investigations conducted by the <br />owner/operator, or the applicable local'or state regulatory authority, it is determined that the <br />SWPPP is ineffective' in. eliminating or significantly minimizing pollutants in stormwater <br />discharges from the site. The SWPPP shall be modified as necessary to include additional <br />or modified BMPs designed' to correct problems identified. .Revisions to the SWPPP shall <br />be completed within seven days following inspection. <br />13: 'Protect 'on=Site"Stormwater Managem'en't'°BMPs for "Runr ff'from"'Hard°Surfaces <br />The use of on -site management BMP's for this project will allow for.the installation of the <br />infiltration trenches at the end of the project: That will protect those areas from disturbance <br />or compaction. In addition, the organic content of .the amended soils will be .tested and <br />verified prior to final project acceptance. <br />Dhaliwal SFR 19-120 <br />December 2020 <br />"Revrsed:'January'2021 Page 8 <br />