Laserfiche WebLink
I <br /> rT 4. What currently happens to rainwater that falls on the site?Surface water runoff from the <br /> parking lot flows towards Hoyt,where it enters the combined sewer system via a catch <br /> basin at the intersection of Wall St. and Hoyt Ave. The roof drain from Imagine Childrens <br /> Museum also connects into the combined sewer system via a catch basin on Hoyt Ave. <br /> 4 5. Please describe any critical areas on the site(wetlands,buffers,steep slopes,etc.)This <br /> information can be obtained from the City's GIS data,and is available at the permit <br /> counter. There are no critical areas on site <br /> 6. What types of soils are found on the site? <br /> **Note:to determine the type of soils on the site,please visit the Natural Resources <br /> Conservation Service's Web Soil Survey athttp://websoilsurvey.nres.usda.gov/app/, click the <br /> green button that says Start WSS, then type in your address under Quick Navigation, create <br /> an Area of Interest(AO1)and click the second tab(Soil Map). The soil types will pop up with a <br /> hyperlink and the properties of each will be available when you click the hyperlink. <br /> Alderwood-Urban land complex, 2 to 8 percent slopes. The parent material is Basal Till. <br /> Page 2 of 7 <br /> CITY OF EVERE I 13200 Cedar Street Everett,WA 98201 1425-257-8810 I everettwa,gov <br />