Laserfiche WebLink
Table of Contents <br /> Project Information (1.0) 6 <br /> Existing Conditions(1.1) 6 <br /> Proposed Construction Activities(1.2) 7 <br /> Construction Stormwater Best Management Practices(BMPs) (2.0) 8 <br /> The 12 Elements(2.1) 9 <br /> Element 1: Preserve Vegetation/Mark Clearing Limits(2.1.1) 9 <br /> Element 2: Establish Construction Access (2.1.2) 10 <br /> Element 3:Control Flow Rates(2.1.3) 11 <br /> Element 4: Install Sediment Controls(2.1.4) 12 <br /> Element 5: Stabilize Soils(2.1.5) 14 <br /> Element 6: Protect Slopes(2.1.6) 16 <br /> Describe how slopes will be designed,constructed,and protected to minimize erosion 16 <br /> Element 7: Protect Drain Inlets(2.1.7) 17 <br /> Element 8: Stabilize Channels and Outlets(2.1.8) 18 <br /> Element 9: Control Pollutants(2.1.9) 19 <br /> Element 10: Control Dewatering(2.1.10) 23 <br /> Element 11: Maintain BMPs(2.1.11) 24 <br /> Element 12: Manage the Project(2.1.12) 25 <br /> Element 13: Protect Low Impact Development(LID) BMPs(2.1.13) 28 <br /> Pollution Prevention Team (3.0) 28 <br /> Monitoring and Sampling Requirements(4.0) 30 <br /> Site Inspection (4.1) 30 <br /> Stormwater Quality Sampling(4.2) 30 <br /> Turbidity Sampling (4.2.1) 30 <br /> pH Sampling(4.2.2) 33 <br /> Discharges to 303(d)or Total Maximum Daily Load (TMDL)Waterbodies(5.0) 34 <br /> 303(d) Listed Waterbodies(5.1) 34 <br /> TMDL Waterbodies(5.2) 34 <br /> Reporting and Record Keeping(6.0) 36 <br /> Record Keeping(6.1) 36 <br /> Site Log Book(6.1.1) 36 <br />