Laserfiche WebLink
PUBLICVORKS PERMIT ODateApplied: 6/10/2019 <br /> City of Everett Permit Services Public Works Permit#: PW1906-020 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: B1906-009 <br /> �, .lii►,� it Everett, WA 98201 Planning Reference#: <br /> WASH iMGT°N 425-257-8810 Public Works Fee: $4,817.56 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> CHILDREN'S MUSEUM OF SNO CO CLARK,ADAM <br /> 3013 COLBY AVE 2812 ARCHITECTURE <br /> EVERETT,WA, 98201 <br /> PHONE: PHONE:4252522153 <br /> TAX PARCEL ID It:00645171800100 SITE ADDRESS: 1502 WALL ST <br /> DESCRIPTION:SITE WORK FOR IMAGINE CHILDREN'S MUSEUM EXPANSION <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated 10/14/2020.Approved plans must <br /> remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required <br /> inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any broken or damaged sidewalk/public right-of-way shall be repaired/replaced in accordance with current City of Everett Standards and per the City <br /> Public Works Inspector. <br /> 7. All sidewalks,ramps,and driveways shall comply with accessibility standards and City of Everett Standards current at the time of construction. <br /> 8. Install and maintain erosion control measures per City of Everett Standards and the direction of the PW Inspector.Remove upon completion of the project <br /> prior to final approval of the permit. <br /> 9. Keep City streets clean at all times.No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 10. Protect all existing underground utilities during construction. <br /> 11. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on-site in a manner <br /> that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the improvements located therein. <br /> 12. A DCVA is required on the domestic service where plumbing height exceeds 30'. <br /> 13.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.Schedule the existing Planning Landscape <br /> inspection under"My Active Inspections"in your dashboard on the Online Permitting Portal. <br /> 14. An Annual Right-of-Way Use Permit(or subsequent code requirement)shall be in place prior to finaling this permit and/or any use of the proposed ramp <br /> in the right-of-way.Obtain an application from Permit Services for the initial use.Annual renewals will be required in order for the ramp to remain.Any <br /> violation will result in the requirement for the ramp to be removed and necessary tenant accommodations to be made inside the building with valid permits at <br /> the owner's expense. <br /> 15.Everett Transit has two bus stops on Wall St at/near the Children's Museum. If any work on this project will impact access to either of these stops,ET <br /> requests at least 48 hours notice. <br /> 16.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy.Request a final inspection online by selecting PW 24-Site <br /> Final within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> Public Works Permit Fee Breakdown: g4 .4u. <br /> Paving(2,622SF) $45.00 <br /> Erosion Control $200.00 PW Plan Review $270.11 OCT <br /> 2 , 2020 <br /> PW Site Inspection $540.21 <br /> Stormwater System Development Fee $3,762.24 CITY OFE <br /> VEn <br /> Peril it sent. TT <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS S <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> . al.44 7awdeeti 104/2020 may arise because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />