Laserfiche WebLink
Alternate soil stabilization BMPs are included in Appendix B as a quick reference tool for the on- <br /> site inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate <br /> during construction to satisfy the requirements set forth in the General NPDES Permit <br /> (Appendix E). To avoid potential erosion and sediment control issues that may cause a <br /> violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix E), the <br /> Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or <br /> more of the alternative BMPs listed in Appendix B after the first sign that existing BMPs are <br /> ineffective or failing. <br /> The project site is located west of the Cascade Mountain Crest. As such, no soils shall remain <br /> exposed and unworked for more than 7 days during the dry season (May 1 to September 30) <br /> and 2 days during the wet season (October 1 to April 30). Regardless of the time of year, all <br /> soils shall be stabilized at the end of the shift before a holiday or weekend if needed based on <br /> weather forecasts. <br /> Installation Schedules: [Insert text here] <br /> Inspection and Maintenance plan: [Insert text here] <br /> Responsible Staff: [Insert text here] <br />