Laserfiche WebLink
Element 8: Stabilize Channels and Outlets (2.1 .8) <br /> Describe how you will prevent downstream erosion where site runoff is to be conveyed in <br /> channels, discharged to a stream or, discharged to a natural drainage point. <br /> West of the Cascade Mountains Crest <br /> On-site conveyance channels must handle the peak 10-minute flow rate from a Type 1A, 10- <br /> year, 24-hour frequency storm for the developed condition. Alternatively, the 10-year, 1-hour <br /> flow rate predicted by an approved continuous runoff model, increased by a factor of 1.6, may <br /> be used. <br /> The hydrologic analysis must use the existing land cover condition for predicting flow rates from <br /> tributary areas outside the project limits. <br /> For tributary areas on the project site, the analysis must use the temporary or permanent project <br /> land cover condition, whichever will produce the highest flow rates. <br /> If using the WWHM to predict flows, bare soil areas should be modeled as "landscaped area". <br /> Provide stabilization, including armoring material, adequate to prevent erosion of outlets, <br /> adjacent stream banks, slopes, and downstream reaches, will be installed at the outlets of all <br /> conveyance systems. <br /> No BMPs are applicable for this project. <br /> Installation Schedules: [Insert text here] <br /> Inspection and Maintenance plan: [Insert text here] <br /> Responsible Staff: [Insert text here] <br />